6 | List of Materials |
|
List of Materials
Parts Included with your Hood
Hood structure assembly with blower, transition. Lamp already installed.
2 grease lters 30”or 3 grease lters 36”. Duct covers.
Hardware bag with:
Template
Duct cover support bracket (1 piece)
Use, care and installation guide
Wood screws (6 pieces - 3/16" x 1" 3/4)
Concrete wall anchors (6 pieces - 3/8” X 13/8”) Assembly screws (8 pieces)
Optional Accessories
Telescopic duct cover to t ceiling height from 9'
to 10'
Re circulation KIT Charcoal Filter
Tools/Materials required
Duct tape Wire nuts
Tape to mount template
1/2” electrical connector (junction box)
8" rounded metal duct length to suit installation Measuring tape
Pliers
Gloves
Knife
Safety glasses
Electric drill with 5/16” and 3/8” Bits Strain relief
Spirit level Duct tape Screwdrivers:
Phillips (Posidrive) # 2 Torx # 2
Wire cutter/stripper Masking tape Hammer
Saw, jig saw or reciprocating saw