Emerson Process Management 2051CF manual Rosemount, MOUNT THE TRANSMITTER A. Applications, Flow

Models: 2051 2051CF

1 24
Download 24 pages 40.07 Kb
Page 3
Image 3
STEP 1: MOUNT THE TRANSMITTER

Quick Installation Guide

00825-0100-4101, Rev EA June 2010

Rosemount 2051

STEP 1: MOUNT THE TRANSMITTER

A. Applications

Liquid Flow Applications

1.Place taps to the side of the line.

2.Mount beside or below the taps.

3.Mount the transmitter so that the drain/vent valves are oriented upward.

 

w

lo

F

 

Gas Flow Applications

1.Place taps in the top or side of the line.

2.Mount beside or above the taps.

Liquid Flow ApplicationsGas Flow ApplicationsFlowSteam Flow ApplicationsManual backgroundManual backgroundManual backgroundFlow

Steam Flow Applications

1.Place taps to the side of the line.

2.Mount beside or below the taps.

3.Fill impulse lines with water.

 

w

lo

F

 

3

Page 3
Image 3
Emerson Process Management 2051CF Rosemount, MOUNT THE TRANSMITTER A. Applications, Quick Installation Guide, Flow