Installation Instructions

COMPLETE PIPING CONNECTIONS

8.Charge to proper weight, charge based on feet of interconnect (tables starting on page 10).

9.Refer to Charts on page 12 to “fine tune” the refrigerant charge to meet your conditions.

S1C

S2C

Shown

Shown

Note: Charging should be done with a dial-a-charge or weighed in with a scale.

REFRIGERANT PROCESSING

IMPORTANT NOTES:

1. To find the charge adjustment and system charge for any evaporator and tubing length:

Line Adjustment = (Line Charge/FT) x Line Length

System Total = Factory Charge + Line Adjustment 2. Round to the nearest ounce and allow for gauges and hoses.

S1C REFRIGERANT CHARGE TABLE

CONDENSER

 

EVAPORATOR PAIRING

LINE CHG/FT

FACTORY CHARGE

S1C9

 

CAH12

.25 oz.

37 oz.

S1C2

 

CAH12

.25 oz.

40 oz.

S1C8

 

CAH24

.56 oz.

51 oz.

S1C4

 

CAH24

.56 oz.

65 oz.

S1C3

 

CAC36

.56 oz.

72 oz.

S1C6

 

CAC36

.56 oz.

90 oz.

S1C9

 

WLH09/UNH09

.25 oz.

37 oz.

S1C2

 

WLH12/UNH12

.25 oz.

40 oz.

S1C8

 

WLH24/UNH24

.56 oz.

51 oz.

S1C4

 

WLH24/UNH24

.56 oz.

65 oz.

 

 

 

 

 

S1C3

 

WLC30/UNC36

.56 oz.

72 oz.

 

 

 

 

 

S1C6

 

WLC36/UNC36

.56 oz.

90 oz.

 

 

 

 

 

 

S1H (Heat Pump) REFRIGERANT CHARGE TABLE

CONDENSER

 

EVAPORATOR PAIRING

LINE CHG/FT

FACTORY CHARGE

S1H9

 

WLH09/UNH09

.25 oz.

41 oz.

S1H2

 

WLH12/UNH12

.25 oz.

44 oz.

S1H8

 

WLH24/UNH24

.56 oz.

53 oz.

S1H4

 

WLH24/UNH24

.56 oz.

67 oz.

Side Discharge Condensers

10

www.enviromaster.com

Page 10
Image 10
EMI Volts/HZ/pH manual Refrigerant Processing