ASSEMBLY OF STOVE CASTING (continued)

12.The following procedure will provide a snug fit between the casting front and the casting sides. Grasp the right, front leg, push inward on the leg in order to provide a snug fit between the casting front and the casting side. Continue to hold the right, front leg as you completely tighten the (2) 3/8" bolts that attach the leg pad to the right, casting side. Repeat procedure for left, front leg to achieve a snug fit between the casting front and the casting side.

13.Remove the casting front from the casting.

14.Refer to Figures 10 and 11, the appliance firebox can now be inserted into the casting. Center the firebox in the casting. Attention: Remove (1) Phillips-head screw in the top of the valve cover. The screw is used to secure the valve cover in place during shipping. The (1) Phillips-head screw can be discarded.

15. Refer to Figure 12, align (4) clearance holes on rear cover with screw holes in (2) upper mounting brackets and diverter back assembly. Attach firebox to rear cover with (4) 10 x 1/2" screws.

16. Attach casting front to casting as described in Step 11.

17. Place the casting top onto the casting. The casting top nests into the casting.

18. Insert center grill, left grill and right grill into casting top.

19.Level appliance by adjusting leveling bolts.

20.Assembly of stove casting is completed.

Figure 10

Figure 11

OPTIONAL STONE INLAY INSTALLATION

Whenever the standard grill top is replaced with a stone inlay you must install the top shield and heat shield, which are provided with the stone inlay.

Installation of Optional Stone Inlay

1.Remove left grill, center grill and right grill from casting top.

2.Remove casting top from outer casting.

3.Place the casting top on a non-abrasive surface in order to protect the porcelain finish. The exterior of the casting top should be facing the non-abrasive surface.

4.Attach 11 5/8" x 11 5/8" top shield to the interior of the casting top with (1) 3/8" bolt provided in hardware package.

5.Remove the (2) 1/2" hex-head screws located on the front of the heat exchanger top. The screws are 8 3/4" apart. Do not remove the center hex-head screw. Remove the (2) screw hole, knockouts located on the back of the heat exchanger top. The knockouts are 8 3/4" apart. Position the angled front on the 12"

x 19 3/8" heat shield with the front of the appliance. Align the

(4) tabs with clearance holes on the 12" x 19 3/8" heat shield with the (4) screw holes on the heat exchanger top. Attach the 12" x 19 3/8" heat shield to the heat exchanger top with (2) 1/2" hex-head screws removed in Step 5 and (2) 1/2" hex-head screws provided in hardware package.

6.Place the casting top onto the casting. The casting top nests into the casting.

7.Insert center stone inlay, left stone inlay and right stone inlay into casting top.

8.Installation of stone inlay is completed.

Parts List

Part Description

Part Number

Quantity Supplied

11 5/8" x 11 5/8" Top Shield

CI-091

1

12" x 19 3/8" Heat Shield

CI-092

1

3/8" Bolt

R-3646

1

1/2" Hex-Head Screw

R-2737

4

Page 12

15627-4-0806

Page 12
Image 12
Empire Comfort Systems pmn manual Optional Stone Inlay Installation, Installation of Optional Stone Inlay, Parts List