Empire Comfort Systems RH-50-6 Optional Blower Installation Instructions, Models, RH-50C-1

Models: RH-65-6 RH-65C-1 RH-50-6 RH50C-1

1 20
Download 20 pages 60.93 Kb
Page 16
Image 16
OPTIONAL BLOWER INSTALLATION INSTRUCTIONS

OPTIONAL BLOWER INSTALLATION INSTRUCTIONS

FRB-3 For Vented Room Heaters

Models

 

RH-50-(1, 2, 3, 4, 5, 6)

RH-50C-1

RH-65-(1, 2, 3, 4, 5, 6)

RH-65C-1

Figure 1

Installing Optional Blower

1.Remove rear shield (2 screws) and bottom reflector (4 screws). (See Figure 1)

2.Align blower cushion with bottom assembly air discharge opening. Foil face side of blower cushion should be placed upward.

3.Align blower housing with blower cushion and use two #10 x 1/2” (13mm) hex-head screws to attach blower housing to bottom assembly. (See Figure 2)

4.Save bottom reflector and rear shield (removed in Step 1) in the even the blower housing is removed from room heater.

Attention! Bottom reflector and rear shield must be at- tached to bottom assembly whenever the blower housing in removed from the room heater and the room heater is in operation.

5.Remove switch box cover from the switch box by removing the #8 x 1/4” (6mm) hex-head screw.

6.There are two screw holes on the lower back of the combus- tion chamber. Use only the left screw hole for mounting.

7.With the switch box perpendicular to the combustion chamber, align the round clearance hole on the switch box with the left screw hole on the combustion chamber (See Figure 3).

8.Attach switch box to the combustion chamber using the #10 x 1/2” (13mm) hex-head screw provided.

9.Attach switch box cover to the switch box by using the #8 x 1/4” (6mm) hex-head screw. (See Figure 4)

Figure 2

Figure 3

Figure 4

12822-4-0806

Page 16

 

Page 16
Image 16
Empire Comfort Systems RH-50-6 Optional Blower Installation Instructions, FRB-3 For Vented Room Heaters, Models, RH-50C-1