Energy Tech Laboratories RSIB 300-500 manual Mounting of Power Venter

Models: RSIB 300-500

1 16
Download 16 pages 9.99 Kb
Page 7
Image 7

3002503

11.06

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The figure below shows typical installation arrangements:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fig. 3

Vertical

 

 

 

 

 

 

 

 

 

 

 

 

 

Sidewall

 

 

 

 

 

 

 

 

 

Venting

Venting

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3.3 Mounting of Power Venter

The power venter can be installed in a variety of positions. It can be suspended from a ceiling or placed on a shelf/floor. Placement on a shelf requires special hardware and vibration dampers.

Suspension from a ceiling does not require any special hardware other than threaded rods, nuts, and hangers.

Fig. 4

Threaded rod

Follow Fig. 4 and 5. when suspending the power venter from a ceiling. Fig. 4 shows which mounting legs to use when installing the power venter in its normal position with inlet in the back and outlet on the top (installation between horizontal and vertical chimney). Fig. 5 shows which mounting legs to use when installing the power venter with inlet on the bottom and outlet on the side (installation for sidewall venting).

1.Once the position has been determined, hang four threaded

rods from hangers above, and slide the rods through the mounting holes in the mounting legs.

2.Level the power venter.

3.Secure the legs with washers and nuts.

Warning! Never install the power venter so the motor points down. This will shorten the life. The min. clearance to combustibles is 24 inches.

Mounting legs

Fig. 5

Mounting legs

UP

Nuts

Threaded rods

UP

Nuts

Page 7
Image 7
Energy Tech Laboratories RSIB 300-500 manual Mounting of Power Venter, Figure below shows typical installation arrangements