Enterasys Networks C3G124-48P, C3G124-24P manual Connecting AC Power and RPS

Models: C3G124-24P C3G124-48P

1 89
Download 89 pages 16.17 Kb
Page 55
Image 55

Connecting AC and PoE Power

Figure 3-8 Connecting AC Power and RPS

STACK

OW

1705.A050-C-2A64L0I0MNHVEzAC AX

Á

À

Redundant

Power

Supply

Â

1 AC power cord 2 AC power connector 3 Connector for external redundant power supply

3.Observe the power CPU LED (not shown) located on the front panel. During the initialization, the CPU LED will start by illuminating solid amber, then start blinking green, then blinking amber, then blinking green again until the end of the initialization, and then turns solid green.

Note: If the CPU LED illuminates solid red, there was a critical failure. For more information about the LED indications and troubleshooting, refer to Chapter 4. If you need additional help, contact Enterasys Networks. Refer to “Getting Help” on page xviii for details.

If the switch is a standalone unit, it will take approximately 30 seconds for the switch to start up. If the switch is a stack Manager, it can take up to 3 minutes or more to start up, depending on the number of Member switches in the stack.

3-16 Hardware Installation

Page 55
Image 55
Enterasys Networks C3G124-48P, C3G124-24P manual Connecting AC Power and RPS