Enterasys Networks VH-8TX1UM, VH-8TX1MF Installation, Inspecting Your Shipment, Site Requirements

Models: VH-8TX1MF VH-8TX1UM

1 54
Download 54 pages 63.34 Kb
Page 29
Image 29

2. INSTALLATION

Inspecting Your Shipment

When you receive the shipment of your switch, check the package contents and make sure you have the following items:

VH-8TX1UM or VH-8TX1MF switch

Mounting ears and mounting screws

Four rubber feet

ESD wrist strap

Power cord

RS-232 null-modem cable

Product documentation

Site Requirements

Before you install the switch, make sure the site meets the following requirements:

Mounting

Provide a flat table, shelf surface, or an optional 19 in. (48.3 cm) equipment rack.

Use an EIA standard equipment rack that is grounded and physically secure.

Power source

Provide a power source within six feet (1.8 m) of the installation location. This source must provide 100 VAC to 240 VAC at 50 to

60 Hz, for 90 VA maximum power consumption. Power specifications for the switch are shown in Appendix A, “Technical Specifications.”

NOTE: Primary voltage selection within the above ranges is automatic and requires no user action.

Environmental

Install the VH-8TX1UM/VH-8TX1MF switch in a dry area, with adequate air circulation. Avoid placing the switch in direct sunlight or near other heat sources, such as hot-air vents. For temperature and humidity specifications, see Appendix A, “Technical Specifications.”

Ventilation

Do not restrict airflow by covering or obstructing air inlets on the side of the switch.

9033718-01

Installation 15

Page 29
Image 29
Enterasys Networks VH-8TX1UM, VH-8TX1MF manual Installation, Inspecting Your Shipment, Site Requirements