Enviro C-10608 owner manual Through Wall Installation with Exterior Blower Kit

Models: C-10608

1 36
Download 36 pages 58.16 Kb
Page 23
Image 23

Installation

TYPICAL THROUGH WALL WITH EXTERIOR BLOWER KIT INSTALLATION - HORIZONTAL TERMINATION:

�� �

 

��� �����

 

�������� ���� ������

 

������ �� ��������� �����

 

����������� ����

 

��� �����

 

���� �������

���������� �����

�������� ������

 

��� �������

Figure 23: Through Wall Installation with Exterior Blower Kit.

NOTE:

Ensure that all vent connections are installed by placing a small bead of high temperature silicone at each chimney connection.

Also ensure that all vertical vent sections are properly supported and that all clearances to combustibles are maintained in accordance with the vent manufacturer’s specifications.

���� �����

�� ������ ����� ��

��� ������� ������

Figure 24: Through Wall Installation with Exterior Blower Kit; Side View.

Install an amour coated electrical cable from the exhaust blower housing, through the wall thimble plate and attach to the pre drilled hole in the left hand rear hopper pillar. Hook up to wires from the exhaust blower wiring harness.

All electrical connections must be in accordance to local code requirements

23

Page 23
Image 23
Enviro C-10608 owner manual Through Wall Installation with Exterior Blower Kit