ENGLISH |
Set the left leg (without
4 hand brake) upright on the worksurface.
Attach the left end of the sync rod to the left leg. Make sure the brake cables don’t loop around the sync rod. See Warning, right.
WARNING
Keep Brake Cables Away from
Sync Rod and Crossbars
During Installation!
Failure to keep the brake cables away from
sync rod and crossbars may restrict lift
motion and may cause equipment damage
or personal injury! Refer to instruction
manual for more information.
5Partially insert 9 of the provided
9x
Front =2 screws | # | |
Middle = 3 screws | ||
| ||
|
|
NOTE: Do not |
fully insert |
the screws |
into the work- |
surface at this |
time. Leave |
approximate- |
ly 1/8” space. |
Rear = 3 screws
6Use a Phillips screwdriver to insert the provided M5x6 mm screws into the two crossbars connecting the left
and right legs. Make sure the brake cables don’t | 16x |
loop around the crossbars. |
|
Tighten the screws slightly one at a time | M5 x 6 mm |
| |
and repeat to ensure that the tension |
|
on every screw is equal. |
|
NOTE: Do not overtighten screws. overtightening screws may result in stripping the holes and may cause the installation to be unsafe.
7Use a Phillips screwdriver to tighten down the screws attaching the legs to
the worksurface.
NOTE: Do not overtighten screws. overtightening screws may result in stripping the holes and may cause the installation to be unsafe.
6 of 14