6 6 6
ATTACH RAIL TO WALL
Solid Wood Studs
WARNING: | ||
Ensure that the wall structure is |
| |
capable of supporting four times |
|
|
the total weight of mounted |
|
|
equipment. Mounting to wall |
| |
surfaces that do not meet this |
|
|
criteria may result in an unstable, |
|
|
unsafe condition which could |
|
|
lead to personal injury and/or |
|
|
property damage. Consult a |
| * |
construction professional if you |
| |
|
| |
have any doubt about what this |
|
|
means in regard to your particu- | * |
|
lar application. |
| |
|
|
*Before proceeding with this instal- lation, consult the manufacturer of
your display for recommendations on |
| |
choosing a mounting location that |
| |
will ensure optimum performance. | ||
Location considerations might |
| |
include: mounting height - based on |
|
|
size of display, viewing angle - based |
|
|
on room dimensions, access to power |
|
|
outlets, cable connections for speak- | a |
|
ers/accessories, protection from light, |
| |
heat and vibration, etc. |
|
|
a Use an electronic stud finder to | b |
|
locate the center of the studs and |
| |
mark with a pencil. |
|
|
b Apply a long strip of adhesive |
|
|
tape to mark the center of each | c |
|
stud - this will help you position the | ||
display when you hang it on the rail. |
|
a
b
c
c Hold rail against the wall to mark |
|
|
|
| |
mounting holes. (Note rail orienta- |
|
|
|
|
|
tion - front faces display, back faces |
|
| " | ||
wall - illustrated above.) Verify holes |
| OO |
| ||
are level then drill pilot holes with |
|
|
|
| RUPP |
3/16” or 5mm Wood Drill Bit. |
|
|
|
| |
|
|
|
|
| |
7 | 7 |
|
| 7 |
|
Continue to Step 7 on page 16. |
|
| |||
|
|
|