Essick Air ADA7112 Maintenance, Volts, Wiring Diagrams, Bleed-Off, Amperage Draw And Belt Tension

Models: ASA35 AUA7112 ADA5112 ASA7112 ADA35 AUA5112 AUA51 ADA7112 ADA71 ASA5112 ASA71 AUA71 ASA51 ADA51

1 16
Download 16 pages 41.71 Kb
Page 3
Image 3
Bleed-Off
To Switch
45°
Fig. 10
Leaving Air
15°
Entering Air
Bleeder Tee Bleeder Tubing
Restrictor
Overflow
Fig. 8
Pump Hose
Fig. 9
Decrease
Amperage

ASA35 only) and back post panel as

 

7

 

 

 

shown. Install washer (1) and nut (2).

 

 

 

 

Tighten to keep float from turning.

 

 

 

2 3

4

Place nut (4) and ferrule (3) on water

 

 

1

 

supply line. Connect to float fitting

 

5

 

 

 

 

 

 

and tighten until water tight. Bend

 

 

 

 

 

rod (6) to adjust float until water level

6

 

8 (ADA/

 

is about 1 inch below the top of the

 

Fig. 7

ASA35)

 

overflow pipe. Slide float shield (7)

 

 

 

 

 

 

 

 

 

over float body (5) until it snaps into place.

Bleed-Off

Installation of the bleed-off kit is recommended to increase the life of the cooler. A bleed-off system is designed to prevent scale build up by continually removing a small percent of the water in the pan.

Install Bleeder Tee and Tub- ing. Refer to figure 8. Cut the

pump hose and insert the barbed

ends of the bleeder tee into each cut end. Insert one end of the

bleeder tubing onto the bleeder tee and run the other end out of the cooler through the overflow

pipe. Note: A restrictor clamp is

provided which, if desired, may be installed onto the bleeder tubing to restrict the amount of water being bleed off. The amount of water to bleed off depends on the quality of the water in your area. Start with 1-2 gal/hr and increase if needed.

Amperage Draw And Belt Tension

This unit is equipped with an adjustable motor drive pulley for adjusting the blower wheel speed to the proper loading on different duct systems. It is important that the motor drive pulley is adjusted to correct size to assure maximum air delivery without damage to the motor. Be sure to follow these instructions carefully.

Adjust drive pulley. After the unit is completely installed, adjust the drive pulley to the least diameter and adjust belt tension. See the maintenance section for adjusting belt tension.

Start cooler. Install both inspection panels, start pump, and allow to operate until pads are wet.

Check amperage. With pads wet and unit started, check amperage draw with an amperage meter.

Adjust pulley if necessary. If amperage draw is less than motor rat- ing, turn off electrical power and remove inspection panels (top pan for models ADA35 and ASA35). Unplug motor inside cooler, this

will protect you from someone turning on

unit while you are working inside. This should be done for your safety. Adjust

pulley to a larger diameter and readjust belt tension, plug motor in, install inspection panels, and retest amperage draw. Repeat this process until correct amperage draw is attained. Increasing motor pulley diameter

increases amperage draw. Decreasing motor pulley diameter decreases amperage draw (see Fig. 9).

Amperage Draw And Belt TensionCAUTION: Do not operate cooler with larger amperage draw than specified on motor plate.

NOTE: No attempt should be made to completely install this unit without the aid of an electrician or someone familiar with testing amperage draw. Failure to comply with these instructions may void your warranty.

Maintenance

MaintenanceWARNING : Before doing any maintenance be sure power is off. At the time you remove either inspection panel be sure to unplug motor and pump. This is for your safety.

Spring Start-Up

Clean pads. A clean pad is more absorbent, efficient and will give more cool air. Annually, or when required, using a garden hose with nozzle, back wash to clean out the openings, then clean off the inlet face any scale or other obstruction to the passages. Slight scraping may be required to remove hardened scale.

Change pads if necessary. The pads should be replaced after 5 years

or if necessary. To change pads, remove top access panel, remove grill, and disconnect water delivery tube. Remove water distributor holder and lift out media sections. Replace with the same type media. You can purchase them from your dealer.

IMPORTANT: In order to get the best performance from your cool- ing pads, they must be installed properly. If you have purchased a pad with two equal angles, the following instructions can be disregarded. Pads must always be installed with the steeper flute angle sloping down towards the air entering

side (Fig. 10). The reason is simple. The steeper angle puts more water on

the hot, dry, dirty side of

the pad where it is needed most. It also counteracts

the tendency of the air to push the water toward the

back of the pad.

 

 

120 Volts

Wiring Diagrams

240 Volts

 

 

 

 

 

 

 

Blue/Black

Pump

 

 

Blue/Black

 

 

 

White

 

 

 

 

 

 

 

 

 

White

 

 

 

Brown

 

 

 

Pump

 

 

 

 

 

Brown

 

 

Orange

 

 

 

Pump

 

 

 

 

Orange

 

 

Green

 

Pump

 

 

Motor

 

To Switch

 

Green

 

 

Black

Motor

 

 

 

 

Hi

 

Black

Hi

 

 

Red

Lo

 

 

 

 

 

 

Red

Lo

 

 

White

Com.

 

 

 

Black

 

 

White

 

Hi

Orange

 

 

Black

Com.

Red

Ground

Hi

Orange

Lo

Green

Red

Green

Ground

White

 

 

Lo

Com.

 

 

Orange

 

 

Green

 

= Wire Nut

Com.

Green

 

= Wire Nut

Ground

Blower Motor

 

Ground

 

 

 

 

 

Blower Motor

 

 

110498-2

3

Page 3
Image 3
Essick Air ADA7112, ADA51 Maintenance, Volts, Wiring Diagrams, Bleed-Off, Amperage Draw And Belt Tension, Spring Start-Up