Extron electronic FOX HD-SDI Installation and Operation, cont’d, 6- Projector pole on the inside

Models: FOX HD-SDI

1 20
Download 20 pages 19.17 Kb
Page 13
Image 13
Figure 2-6 — Projector pole on the inside

Installation and Operation, cont’d

3. Use the two included tie wraps to strap the power supply to one of the brackets.

NThe PMK 300 has a hole in the bottom plate that allows the projector pole to be inserted through the center of the plate (figure 2-6), rather than outside of the plate (figure 2-5).

To install the PMK 300 in this configuration, slide the bracket up from the bottom of the pole before the projector is installed on the pole.

Bracket

Brace

U-Bolt

Extron

PMK 300

 

Multi-product Projector

Mount Kit

Figure 2-6 — Projector pole on the inside

4.

Place the contoured bracket brace against the pole and

 

opposite the back plate. The pole should fit snugly into the

 

depression in the center of the bracket brace.

5.

Place the U-bolt around the ceiling pole and insert the

 

two legs of the U-bolt through the round holes on the

 

contoured bracket brace and then through the slotted holes

 

on the bracket’s mounting plate.

NThe supplied U-bolt fits a typical (1.5" to 2.0" diameter) ceiling pole.

6.

Secure the bracket to the U-bolt with the included hex

 

nuts, washers, and lock washers. Tighten the hex nuts just

 

enough that they can be loosened by hand.

PMK 350 mounting

Mount the transceiver to a PMK 350 bracket as follows:

1.

Remove the front and back plates from the PMK 350

 

(figure 2-7), using an Extron Tweeker or a #2 Philips

 

screwdriver. Retain the screws to reattach the plates when

 

you are finished.

 

 

 

Extron

Rear Plate

Quarter-rack

 

 

Sized Product

 

 

Contoured

 

 

Base

 

 

L-shaped

 

 

Bracket

Extron

U-bolt

 

PMK 350

 

 

 

Multi-product Projector

 

Mounting Kit

 

 

 

Extron

 

 

Power Supply

Front Plate

 

 

Cover Sheet

Figure 2-7 — PMK 350 projector mounting a transceiver

2.

If necessary, remove the feet from the bottom of the

 

receiver.

3.

Secure the transceiver to one side of the mounting tray,

 

using two of the supplied 4-40 x 3/16" screws in opposite

 

(diagonal) corners.

4.

Use the two included tie wraps to strap the power supply

 

to the bracket.

5.

Place the PMK 350 around the projector ceiling mounting

 

pole (figure 2-7, above).

2-8

FOX HD-SDI • Installation and Operation

FOX HD-SDI • Installation and Operation

2-9

Page 13
Image 13
Extron electronic Installation and Operation, cont’d, FOX HD-SDI Installation and Operation, PMK 350 mounting