Part VI: Installation / Wiring Diagrams

INSTALLATION

Your Faria Antares unit can be mounted to your instrument panel in 4 ways; Panel Mount, Flush Mount, Gauge Mount, and Gimble Mount

Panel Mount

Step 1: Cut a square hole with rounded corners to match the dimensions as indicated in the figure below.

Step 2: Insert the Antares unit from front of panel, placing the Panel Mount Gasket (GK0206) between the Antares and the panel.

Step 3: From back of panel, install back clamp. The four interior studs should line up with the four interior holes of the back clamp. Tighten the supplied nuts, washers, and lock washers to 7-10 inch pounds (slightly more than finger tight)

Step 4: Connect 9-pin (HN0604) and 20-pin (HN0605) wire harnesses to back of Antares unit. Proper connection requires the locking ring on each harness to be rotated about ¼ turn.

Step 5: Connect available inputs to corresponding wire harnesses. See pages 34-37 for detailed wiring information

31

Page 34
Image 34
Faria Instruments IS0250a owner manual Installation, Panel Mount