INSTALLATION
CLEARANCE SPECIFICATIONS
00 & 450 INSTALLATION
MINIMUM CLEARANCES TO COMBUSTIBLE MATERIAL.
Heater Mounting Body Assy.
| FRONT VIEW |
| Wall |
| (Combustible |
| Surface) |
18" | 48" |
min. |
|
Wall |
(Combustible |
Surface) |
18" |
min. |
96" min.
Make sure the heater is level (see Warning on page 6).
FLOOR
7