
Ball Opening
2Chute Sleeves
Upright | Upright |
Tube | Tube |
FRONTBACK VIEWVIEW
STEP 34
•Position the chute between the upright tubes. The ball opening should face the side nets.
•Now, fit both chute sleeves onto an upright tube.
46
2Chute Sleeves
Upright | Upright |
Tube | Tube |
•Position the chute between the upright tubes. The ball opening should face the side nets.
•Now, fit both chute sleeves onto an upright tube.
46