Assembly
Boulder Hopper
A
7B
•First, fi t the tabs on the top of the boulder hopper onto the grooves in the track A .
•Next, fi t the hopper base into the slot in the ramp B .
•Then, push to “snap” the boulder hopper in place.
Boulder Crane
8
•Turn the assembly around so that the gas pump faces away from you.
•Fit the base of the boulder crane into the socket in the track, as shown. Push to “snap” in place.
Elevator Crane
9
•Fit the base of the elevator crane into the socket in the tower top. Push to “snap” in place. Hint: This may require some force.
7