www.fmiproducts.com 121353-01H8
INSTALLATION
Outlet
Air
Ventilated
Attic
Outlet
Air
Inlet
Air
Inlet Air Ventilated
Crawl Space
To
Crawl
Space
To Attic
AIR FOR COMbUSTION AND VENTILATION
Continued
Figure 2 - Ventilation Air from Inside
Building
Or
Remove
Door into
Adjoining
Room,
Option
3
Ventilation Grills
Into Adjoining Room,
Option 2
Ventilation
Grills Into
Adjoining
Room,
Option 1
12"
12"
Ventilation Air From Outdoors
Provide extra fresh air by using ventilation
grills or ducts. You must provide two perma-
nent openings: one within 12" of the ceiling
and one within 12" of the oor. Connect these Figure 3 - Ventilation Air from Outdoors
items directly to the outdoors or spaces open
to the outdoors. These spaces include attics
and crawl spaces. Follow the National Fuel
Gas Code, ANSI Z223.1/NFPA 54, Air for
Combustion and Ventilation for required size
of ventilation grills or ducts.
IMPORTANT: Do not provide openings for
inlet or outlet air into attic if attic has a thermo-
stat-controlled power vent. Heated air entering
the attic will activate the power vent.
NOTICE: This heater is intended
for use as supplemental heat.
Use this heater along with your
primary heating system. Do not
install this heater as your pri-
mary heat source. If you have a
central heating system, you may
run system’s circulating blower
while using heater. This will help
circulate the heat throughout the
house. In the event of a power
outage, you can use this heater
as your primary heat source.
WARNING: A qualied ser-
vice person must install heater.
Follow all local codes.
NOTICE: State or local codes may
only allow operation of this appli-
ance in a vented conguration.
Check your state or local codes.
WARNING: Before installing
in a solid fuel burning replace,
the chimney ue and rebox
must be cleaned of soot, creo-
sote, ashes and loose paint by a
qualied chimney cleaner. Creo-
sote will ignite if highly heated.
A dirty chimney ue may create
and distribute soot within the
house. Inspect chimney ue and
rebox for damage. If damaged,
repair ue and rebox before
operating heater.
WARNING: Seal any fresh
air vents or ash clean-out doors
located on oor or wall of re-
place. If not, drafting may cause
pilot outage or sooting. Use a
heat-resistant sealant. Do not
seal chimney ue damper.