Recirculation version air outlet
• Fix the connection 15 to the frame using the 4 screws provided.
• Fix the flange 10 to the lower opening of the connec- 15 tion 15.
• Connect the hood air outlet to the flange in the lower part of the junction using a rigid or flexible ø 150 tube (by installer’s choice).
10
Flue assembly - Mounting the hood body | 12c |
• Position the upper chimney section and fix the upper part to the frame using the 2 screws 12c (2,9 x 6,5) provided.
• Similarly, position the lower chimney section and fix the lower part to the frame using the 2 screws 12c (2,9 x 6,5) provided.
Before fixing the hood body to the frame: | 12c |
•Remove the grease filters from the hood body.
•Remove any activated charcoal filters.
• From below, use the 4 screws 12f | (M6 | x |
10)provided to fix the hood body to the frame. | 12f |
EN |
| 1 |
| 12 |