5) Indoor Airflow Data
The
To change to high speed replace the low speed lead (blue) with the high speed lead (black) on the blower relay.
| VEA/VHA24K |
| ||
| Low | High |
| |
.1” ESP | 750 | 815 |
| |
.2” ESP | 725 | 780 | All values listed are inches | |
.3” ESP | 700 | 745 | W.C. with a wet indoor coil | |
|
|
| with filter installed. | |
.4” ESP | 675 | 700 | ||
|
6) Chassis Installation
NOTE: Prior to installing the chassis, ensure that the drain pan and line are free from debris.
A.Ensure that the wall plenum is installed in accordance with the
B.Ensure that the VPDP1 drain pan is installed correctly (see page 8). Using the 3/4" plugs supplied with the pan, plug the unused condensate drain hole. Connect a drain to the condensate exit location. Be sure to use teflon tape or approved pipe sealant on all drain connections and plugs (see page 8).
C.Place the chassis into the closet with the outdoor side facing the wall plenum opening.
D.Slide the chassis into the wall plenum until the plenum divider seal is established and the
Figure 10
Slide-in View / Chassis Installation
The
NOTE: Prior to installing the chassis, |
|
ensure that the drain pan and line are free | 23/8 |
from debris. |
Chassis to plenum gasket
11