II. Installation
1) Utility Closet Dimensions
Recommended utility closet dimensions and a typical indoor installation are illustrated in Figure 1. Three inches minimum clearance on three sides of the unit must be allowed for return airflow, installation access and service access. See Figures 1 & 2 for clearances and reference dimensions.
Figure 3 | Typical Utility Closet |
Chassis Shown in Closet, on Optional Platform
Rigid Ductwork | |
| |
Filter (25" x 20") |
|
58"
| Exterior Wall |
| Flexible Ductwork |
Power | |
| |
Disconnect | Plenum |
|
29"
VPRG4 Access Panel &
Return Air Filter Grille
Optional Platform
3" Clearance on all |
|
| |
three sides |
| VPDP1 drain pan | |
minimum for |
| ||
Chassis is | beneath unit is | ||
| |||
| shipped with | required on all | |
| vibration | VEA/VHA24 units. | |
| isolators | Drain pan must be | |
| installed | installed prior to | |
|
| chassis installation |
Figure 4 | Top View |
control box |
|
| electrical |
| entrance |
•
•
•VPRG4 Access Panel cutout dimensions: 27" wide by 55 3/4" high.
•See Figure 8 (Page 10) for proper chassis installation.
NOTE: Drain pan must be installed in closet prior to chassis insertion into plenum. See Figure 7 (page 8) for drain pan installation details.