Installation Instructions

Read these instructions completely and carefully.

Before You Begin

NOTE TO INSTALLER: Leave these instructions with the air conditioner after installation is completed.

NOTE TO CONSUMER: Keep this Installation and Operating Manual for future use.

Important notes:

It is recommended that proper attire be worn during installation.

For personal safety, this air conditioner must be properly grounded.

It is important to have the wall outlet and circuit checked by a qualified electrician if there is any doubt as to whether a proper ground exists.

Electrical Data

CAUTION:

Do not under any circumstances, cut or remove the third (ground) prong from the power cord.

Do not change the plug on the power cord of this air conditioner.

Aluminum house wiring may present special problems–consult a qualified electrician.

Line Cord Plug

Use Wall Receptacle

Power Supply

Use 15 AMP time delay fuse or circuit breaker.

Power supply cord with

Standard 125V, 3-wire grounding

3-prong grounding plug

receptacle rated 15A, 125V AC

Tools You Will Need

Phillips-head screwdriver

Scissors or knife

Flat-blade screwdriver

Pencil

Ruler or tape measure

Level

 

Hammer

8

Page 9
Image 9
Friedrich KQ08E10 manual Installation Instructions, Before You Begin, Electrical Data, Tools You Will Need