Switch the power button to “I” to turn the machine on.

Circuit Priming

To prime the water circuit, place a container under the steam wand (Pannarello, if supplied).

The “STAND-BY”button blinks.

Make sure the selector switch is in the

 

”position; if this is not the case, set

 

it to that position.

To turn the machine on simply press the

 

“STAND-BY”button.

• The blinking icons shown in the picture

warn that the circuit must be primed.

Blinking

Note: Before starting the machine for the first time, and after long periods of inactivity,

prime the water circuit.

Blinking

Slow blinking

Cyclic blinking

Steady on

Turn the selector switch clockwise to set it to the “ ” position. The machine starts the automatic priming of the circuit by letting out a preset quantity of water through the Pannarello.

Once the circuit has been primed, the icons shown in the fi gure will start to blink.

Turn the selection knob back to its central position “”.

The icons displayed blink slowly to show that the machine is warming up.

When warm-up is complete, the machine performs a rinse

cycle of the internal circuits.

During this phase, the icons displayed will blink in sequence.

When the operations described above are completed, the icons on the display will illuminate.

The display will appear as shown to the side. The di- splayed aroma is the factory setting when the machine is switch on for the first time, or it is the same as the aroma that was selected for the last

brewed coffee.

The machine is then ready to brew beverages.

To brew coffee, dispense hot water or steam, and properly use the machine, ca- refully follow the instructions provided.

• 28 •

Page 8
Image 8
Gaggia 037RG manual Circuit Priming, Prime the water circuit, Cycle of the internal circuits, Brewed coffee