6. TEST PROCEDURES AND TROUBLESHOOTING | PRIMARY | |
|
| |
| CAUTION | WINDINGS |
| Secondary | |
OUTLET WHENEVER REMOVING THE CABINET FROM THE UNIT. | Windings | |
PROCEED WITH TESTS ONLY AFTER DISCHARGING THE HIGH |
| |
VOLTAGE CAPACITORS AND REMOVING THE LEAD WIRES ON |
| |
THE PRIMARY WINDING OF THE HIGH VOLTAGE TRANSFORM- |
| |
ERS FOR LOWER AND UPPER MAGNETRONS. | Filament | |
(SEE FIGURE 3) |
| |
| Windings | |
|
| |
A. TEST PROCEDURES | Figure 3 | |
|
| |
COMPONENT | CHECKOUT PROCEDURE | RESULT |
| 1) Check for resistance: Across the filament ter- | Normal reading: |
MAGNETRON | minal of the magnetron with an ohm - meter | Less than 1 ohm. |
on Rx1 scale. |
| |
|
|
Figure 4 |
|
2) Check for resistance: Between each filament | Normal reading: |
terminal of the magnetron and the chassis | Infinite ohms. |
ground with an |
|
| Figure 5 |
| |
|
|
| |
| 1) Measure the resistance: | Normal reading: | |
| With an |
| |
a. Primary winding; | Approximately 1.0 ohms | ||
TRANSFORMER | |||
b. Filament winding; | Less than 1 ohm. | ||
| |||
| c. Secondary winding; | Approximately 60 ohms | |
| 2) Measure the resistance: | Normal reading: | |
| with an |
| |
| a. Primary winding to ground; | Infinite ohms. | |
| b. Filament winding to ground; | Infinite ohms. |
Figure 6
Note: Remove varnish of measured point.