GBC USP 13 manual To be Line

Models: USP 13

1 17
Download 17 pages 17.17 Kb
Page 9
Image 9

Position front (#49) and rear (#56 & #48) supply stack guides so that the posts clear the paper stack by about 1/16”. A stack of 2 to 3 inches is required.

Locate adjustable stack guide post (#59) so that the post is in line with the separating knife. (Figure 13).

48

59

56

49

TO BE IN

LINE

Figure 13

Install front guide rail (#55) so that there is about 1/8” to 1/4” clearance between the lift being transferred and the front guide rail.

Cycle machine and check results.

108

55

29

Figure 14

7

Page 9
Image 9
GBC USP 13 manual To be Line