Problem

 

Possible Causes

What To Do

 

 

 

 

Cube dispenser does not

 

Icemaker turned off or

Turn on icemaker or water supply.

work (on some models)

 

water supply turned off.

 

 

 

 

 

 

 

Ice cubes are frozen to

Remove cubes and move the feeler arm to the

 

 

icemaker feeler arm.

ON (down) position.

 

 

 

 

 

 

Irregular ice clumps in

Break up with fingertip pressure and discard

 

 

storage container.

remaining clumps.

 

 

 

Freezer may be too warm. Adjust the freezer control

 

 

 

to a colder setting, one position at a time, until clumps

 

 

 

do not form.

Water has poor taste/odor

 

Water dispenser has not been

Dispense water until all water in system is replenished.

(on some models)

 

used for a long time.

 

 

 

 

 

Water in first glass is

 

Normal when refrigerator

Wait 24 hours for the refrigerator to completely

warm (on some models)

 

is first installed.

cool down.

 

 

 

 

 

 

Water dispenser has not been

Dispense water until all water in system is replenished.

 

 

used for a long time.

 

 

 

 

 

 

Water system has been drained. Allow several hours for replenished supply to chill.

 

 

 

 

Water dispenser does

 

Water supply line turned

See Installing the water line.

not work (on some models)

 

off or not connected.

 

 

 

 

 

 

 

Water filter clogged.

Replace filter cartridge or remove filter and install plug.

 

 

 

 

 

 

Air may be trapped in the

Press the dispenser pad for at least two minutes.

 

 

water system.

 

 

 

 

 

Water spurting from

 

Newly-installed filter cartridge.

Run water from the dispenser for 2 minutes (about

dispenser

 

 

one gallon).

Water is not dispensed

 

Water in reservoir is

Call for service.

but icemaker is working

 

frozen.

 

 

 

 

 

No water or ice cube

 

Supply line or shutoff

Call a plumber.

production

 

valve is clogged.

 

 

 

 

 

 

 

Water filter clogged.

Replace filter cartridge or remove filter and install plug.

 

 

 

 

Refrigerator has odor

 

Foods transmitting

Foods with strong odors should be tightly wrapped.

 

 

odor to refrigerator.

Keep an open box of baking soda in the refrigerator;

 

 

 

 

 

 

replace every three months.

 

 

 

 

 

 

Interior needs cleaning.

See Care and cleaning.

 

 

 

 

 

 

Defrost water drainage

See Care and cleaning.

 

 

system needs cleaning.

 

 

 

 

 

Moisture forms on

 

Not unusual during

Wipe surface dry.

outside of refrigerator

 

periods of high humidity.

 

 

 

 

 

Moisture collects inside

 

Too frequent or too

 

(in humid weather, air

 

long door openings.

 

carries moisture into

 

 

 

refrigerator when doors

 

 

 

are opened)

 

 

 

 

 

 

 

Interior light does

 

No power at outlet.

Replace fuse or reset the breaker.

not work

 

 

 

 

Light bulb burned out.

See Replacing the light bulbs.

 

 

 

 

 

 

Water on kitchen floor or

 

Drain in the bottom of

See Care and cleaning.

on bottom of freezer

 

the freezer clogged.

 

 

 

 

 

20

 

Cubes jammed in chute.

Poke ice through with a wooden spoon.

 

 

 

 

 

 

 

Page 20
Image 20
GE 20-27 Water in first glass is, Water dispenser does, Water spurting from, Dispenser, Water is not dispensed, Production

20-27 specifications

The GE 20-27 is a groundbreaking innovation in the realm of gas turbine technology, designed to meet the increasing energy demands with unparalleled efficiency and sustainability. This turbine model exemplifies the commitment of General Electric to deliver power solutions that not only drive economic growth but also align with environmental stewardship.

One of the main features of the GE 20-27 is its high efficiency in power generation. The turbine operates within a combined-cycle power plant environment, integrating both gas and steam turbines to maximize energy output from the same fuel input. This method significantly raises the overall efficiency, often exceeding 60%, which is a benchmark in modern power generation.

Technologically, the GE 20-27 employs advanced materials and components that enhance its durability and performance. The turbine blades are made from high-strength alloys and ceramic matrix composites, designed to withstand extreme temperatures and stresses. This focus on materials science not only improves the longevity of the turbine but also enhances its performance, allowing it to operate under a wide range of conditions.

The turbine incorporates cutting-edge aerodynamic design principles to increase airflow and optimize combustion efficiency. With its innovative combustion system, the GE 20-27 achieves lower emissions, contributing to cleaner power production. This aspect is particularly vital in a world increasingly concerned with climate change and pollution. The reduced nitrogen oxides (NOx) and carbon emissions make the GE 20-27 a viable option for utilities looking to enhance their environmental profile.

Additionally, the GE 20-27 features advanced digital capabilities through GE's Digital Wind Farm initiatives. This integration allows operators to monitor performance in real-time, utilizing data analytics to predict maintenance needs and optimize operational efficiency. The predictive maintenance capability transforms the way operators manage power generation, leading to reduced downtime and increased reliability.

Another characteristic worth noting is the flexibility of the GE 20-27 to run on various fuels, including natural gas and renewable sources. This versatility allows operators to adapt to changing market conditions and regulatory environments without significant investments in new infrastructure.

In conclusion, the GE 20-27 turbine model showcases a harmonious blend of efficiency, technology, and environmental responsibility. Through advanced design and materials, coupled with digital innovation, it stands as a hallmark of modern energy solutions, capable of addressing both the present and future needs of the global energy landscape.