Connect the Tubing to the Refrigerator

Safety

Before making the connection to the refrigerator, be sure the refrigerator power cord is not plugged into the wall outlet.

One of the illustrations below will look like the connection on your refrigerator.

Instructions

We recommend installing a water filter if your water supply has sand or particles that could clog the screen of the refrigerator’s water valve. Install it in the water line near the refrigerator.

1 Remove the plastic flexible cap from the water valve (refrigerator connection).

2 Place the compression nut and ferrule (sleeve) onto the end of the tubing as shown.

3 Insert the end of the copper tubing into the water valve refrigerator connection as far as possible. While holding the tubing, tighten the

1/4Copper

Tubing

Remove screws and fold back access cover.

OR

Tubing Clamp

1/4Compression Nut

Ferrule

(sleeve)

Refrigerator

Connection

Operating

fitting.

4 Fasten the copper tubing into the clamp provided to hold it in position. You may need to pry open the clamp.

Tubing Clamp

1/4Compression Nut

Ferrule (sleeve)

Refrigerator

Connection

1/4Copper

Tubing

Instructions Installation

Turn the Water On at the Shutoff Valve

 

 

Tighten any connections that leak.

 

 

Replace the access cover and screws (on some

1

 

2

 

 

 

 

 

models).

 

 

 

 

Plug In the Refrigerator

 

 

 

Arrange the coil of copper tubing so that it does not

Push the refrigerator back to the wall.

vibrate against the back of the refrigerator or against

 

 

 

the wall.

 

 

 

Instructions Troubleshooting

Start the Icemaker

Set the icemaker feeler arm to the ON (down) position. The icemaker will not begin to operate until it reaches its operating temperature of 15°F (-9°C) or below. It will then begin operation automatically if the icemaker feeler arm is in the ON (down) position.

NOTE: The icemaker may double-cycle when it first starts, causing some water spillage from the icemaker into the ice bucket. This is normal and should not happen again.

Tips

Customer Service

17

Page 17
Image 17
GE 20-27 owner manual Operating, Tips, Instructions Installation

20-27 specifications

The GE 20-27 is a groundbreaking innovation in the realm of gas turbine technology, designed to meet the increasing energy demands with unparalleled efficiency and sustainability. This turbine model exemplifies the commitment of General Electric to deliver power solutions that not only drive economic growth but also align with environmental stewardship.

One of the main features of the GE 20-27 is its high efficiency in power generation. The turbine operates within a combined-cycle power plant environment, integrating both gas and steam turbines to maximize energy output from the same fuel input. This method significantly raises the overall efficiency, often exceeding 60%, which is a benchmark in modern power generation.

Technologically, the GE 20-27 employs advanced materials and components that enhance its durability and performance. The turbine blades are made from high-strength alloys and ceramic matrix composites, designed to withstand extreme temperatures and stresses. This focus on materials science not only improves the longevity of the turbine but also enhances its performance, allowing it to operate under a wide range of conditions.

The turbine incorporates cutting-edge aerodynamic design principles to increase airflow and optimize combustion efficiency. With its innovative combustion system, the GE 20-27 achieves lower emissions, contributing to cleaner power production. This aspect is particularly vital in a world increasingly concerned with climate change and pollution. The reduced nitrogen oxides (NOx) and carbon emissions make the GE 20-27 a viable option for utilities looking to enhance their environmental profile.

Additionally, the GE 20-27 features advanced digital capabilities through GE's Digital Wind Farm initiatives. This integration allows operators to monitor performance in real-time, utilizing data analytics to predict maintenance needs and optimize operational efficiency. The predictive maintenance capability transforms the way operators manage power generation, leading to reduced downtime and increased reliability.

Another characteristic worth noting is the flexibility of the GE 20-27 to run on various fuels, including natural gas and renewable sources. This versatility allows operators to adapt to changing market conditions and regulatory environments without significant investments in new infrastructure.

In conclusion, the GE 20-27 turbine model showcases a harmonious blend of efficiency, technology, and environmental responsibility. Through advanced design and materials, coupled with digital innovation, it stands as a hallmark of modern energy solutions, capable of addressing both the present and future needs of the global energy landscape.