Installation Instructions

INSTALLING THE WATER LINE (ICEMAKER & DISPENSER MODELS)

BEFORE YOU BEGIN

Recommended copper water supply kits are WX8X2, WX8X3 or WX8X4, depending on the amount of tubing you need. Approved plastic water supply lines are GE SmartConnectRefrigerator Tubing (WX08X10002, WX08X10006, WX08X10015 and WX08X10025).

When connecting your refrigerator to a GE Reverse Osmosis Water System, the only approved installation is with a GE RVKit. For other reverse osmosis water systems, follow the manufacturer’s recommendations.

If the water supply to the refrigerator is from a Reverse Osmosis Water Filtration System AND the refrigerator also has a water filter, use the refrigerator’s filter bypass plug. Using the refrigerator’s water filtration cartridge in conjunction with the RO filter can result in hollow ice cubes and slower water flow from the water dispenser.

This water line installation is not warranted by the refrigerator or icemaker manufacturer. Follow these instructions carefully to minimize the risk of expensive water damage. Water hammer (water banging in the pipes) in house plumbing can cause damage to refrigerator parts and lead to water leakage or flooding. Call a qualified plumber to correct water hammer before installing the water supply line to the refrigerator.

To prevent burns and product damage, do not hook up the water line to the hot water line. If you use your refrigerator before connecting the water line, make sure the icemaker power switch is in the O (off) position.

Do not install the icemaker tubing in areas where temperatures fall below freezing. When using any electrical device (such as a power drill) during installation, be sure the device is double insulated or grounded in a manner to prevent the hazard of electric shock, or is battery powered.

All installations must be in accordance with local plumbing code requirements.

WHAT YOU WILL NEED

Copper or GE SmartConnectRefrigerator Tubing kit, 1/4outer diameter to connect the refrigerator to the water supply. If using copper, be sure both ends of the tubing are cut square.

To determine how much tubing you need: measure the distance from the water valve on the back of the refrigerator to the water supply pipe. Then add 8(2.4 m). Be sure there is sufficient extra tubing (about 8[2.4 m] coiled into 3 turns of about 10[25 cm] diameter) to allow the refrigerator to move out from the wall after installation.

GE SmartConnectRefrigerator Tubing Kits are available in the following lengths:

2(0.6 m) – WX08X10002

6(1.8 m) – WX08X10006

15(4.6 m) – WX08X10015

25(7.6 m) – WX08X10025

Be sure that the kit you select allows at least 8(2.4 m) as described above.

26

Page 26
Image 26
GE 23, 25 operating instructions What YOU will Need

23, 25 specifications

The GE 23 and GE 25 are groundbreaking gas turbine models developed by General Electric, targeting the rapidly evolving energy market with high efficiency and reliability. Both models are integral components of GE’s gas turbine portfolio, designed specifically for a broad range of applications, including power generation and industrial use.

The GE 23 is characterized by its compact design, making it suitable for both small-scale and large-scale applications. With a power output ranging from 23 to 30 megawatts, the GE 23 is equipped with advanced aerodynamics and combustion technologies that significantly enhance its overall performance. One of the standout features of the GE 23 is its ability to offer flexible operation, allowing it to adapt to changing energy demands while minimizing emissions. This flexibility is facilitated by its advanced control systems that ensure optimal performance in varying operational conditions.

In contrast, the GE 25 is designed for larger-scale power generation, delivering outputs of up to 30 megawatts. This model incorporates the latest advancements in material science, providing improved durability and operational lifespan. The GE 25 utilizes high-efficiency blades made from advanced alloys that can withstand extreme temperatures, contributing to improved thermal efficiency. Moreover, the GE 25 features advanced digital controls and monitoring systems, enabling real-time performance optimization and predictive maintenance.

Both turbines employ advanced combustion technology to achieve reduced NOx emissions, aligning with environmental regulations and sustainability goals. These technologies are complemented by GE’s commitment to integrating renewable energy sources into the power grid, enhancing the flexibility of operations.

The GE 23 and GE 25 boast remarkable reliability and lower operational costs, attributed to their simplified maintenance processes and robust design. They are equipped with modular components that facilitate easier serviceability, enabling operators to minimize downtime and optimize their power generation capabilities.

Additionally, the incorporation of advanced digital analytics into both models allows for enhanced performance tracking and system diagnostics, ensuring that operators can maximize efficiency and mitigate risks.

In conclusion, the GE 23 and GE 25 represent the pinnacle of gas turbine technology, combining efficiency, flexibility, and reliability. Their innovative features and commitment to sustainability make them formidable choices for power generation in the modern energy landscape. As global energy demands continue to rise, these models are poised to play a vital role in shaping the future of energy production.