GE 23, 25 operating instructions Turn on the Water Supply, Plug in the Refrigerator

Models: 23, 25

1 112
Download 112 pages 42.41 Kb
Page 23
Image 23

Installation Instructions

1

A

B

CONNECTING THE REFRIGERATOR TO THE HOUSE WATER LINE (icemaker and dispenser models)

A cold water supply is required for automatic icemaker and dispenser operation. If there is not a cold water supply, you will need to provide one. See “Installing the Water Line” section.

NOTES:

Before making the connection to the refrigerator, be sure the refrigerator power cord is not plugged into the wall outlet.

If your refrigerator does not have a water filter, we recommend installing one if your water supply has sand or particles that could clog the screen of the refrigerator’s water valve. Install it in the water line near the refrigerator. If using GE SmartConnectRefrigerator Tubing Kit, you will need an additional tube (WX08X10002) to connect the filter. Do not cut plastic tube to install filter.

If you are using copper tubing, place a compression nut and ferrule (sleeve) onto the end of the tubing coming from the house cold water supply.

If you are using the GE SmartConnecttubing, the nuts are already assembled to the tubing.

If you are using copper tubing, insert the end of the tubing into the refrigerator connection, at the back of the refrigerator, as far as possible. While holding the tubing, tighten the fitting.

If you are using GE SmartConnecttubing, insert the molded end of the tubing into the refrigerator connection, at the back of the refrigerator, and tighten the compression nut until it is hand tight. Then tighten one additional turn with a wrench. Overtightening may cause leaks.

CFasten the tubing into the clamp provided to hold it in position. You may need to pry open the clamp.

Tubing Clamp

 

1/4 Tubing

1/4

 

Compression Nut

 

Ferrule

 

(sleeve)

 

Refrigerator

SmartConnectTubing

Connection

 

2TURN ON THE WATER SUPPLY

Turn the water on at the shutoff valve (house water supply) and check for any leaks.

3PLUG IN THE REFRIGERATOR

Before plugging in the refrigerator, make sure the icemaker power switch is set to the O (off) position.

See the grounding information attached to the power cord.

23

Page 23
Image 23
GE 23, 25 operating instructions Turn on the Water Supply, Plug in the Refrigerator

23, 25 specifications

The GE 23 and GE 25 are groundbreaking gas turbine models developed by General Electric, targeting the rapidly evolving energy market with high efficiency and reliability. Both models are integral components of GE’s gas turbine portfolio, designed specifically for a broad range of applications, including power generation and industrial use.

The GE 23 is characterized by its compact design, making it suitable for both small-scale and large-scale applications. With a power output ranging from 23 to 30 megawatts, the GE 23 is equipped with advanced aerodynamics and combustion technologies that significantly enhance its overall performance. One of the standout features of the GE 23 is its ability to offer flexible operation, allowing it to adapt to changing energy demands while minimizing emissions. This flexibility is facilitated by its advanced control systems that ensure optimal performance in varying operational conditions.

In contrast, the GE 25 is designed for larger-scale power generation, delivering outputs of up to 30 megawatts. This model incorporates the latest advancements in material science, providing improved durability and operational lifespan. The GE 25 utilizes high-efficiency blades made from advanced alloys that can withstand extreme temperatures, contributing to improved thermal efficiency. Moreover, the GE 25 features advanced digital controls and monitoring systems, enabling real-time performance optimization and predictive maintenance.

Both turbines employ advanced combustion technology to achieve reduced NOx emissions, aligning with environmental regulations and sustainability goals. These technologies are complemented by GE’s commitment to integrating renewable energy sources into the power grid, enhancing the flexibility of operations.

The GE 23 and GE 25 boast remarkable reliability and lower operational costs, attributed to their simplified maintenance processes and robust design. They are equipped with modular components that facilitate easier serviceability, enabling operators to minimize downtime and optimize their power generation capabilities.

Additionally, the incorporation of advanced digital analytics into both models allows for enhanced performance tracking and system diagnostics, ensuring that operators can maximize efficiency and mitigate risks.

In conclusion, the GE 23 and GE 25 represent the pinnacle of gas turbine technology, combining efficiency, flexibility, and reliability. Their innovative features and commitment to sustainability make them formidable choices for power generation in the modern energy landscape. As global energy demands continue to rise, these models are poised to play a vital role in shaping the future of energy production.