GE 2800 manual Framing For Wall Case, Fastening Wall Case, Brick Veneer and Frame Construction

Models: 2800

1 60
Download 60 pages 2.9 Kb
Page 26
Image 26
FRAMING FOR WALL CASE

26

FRAMING FOR WALL CASE

Brick Veneer and Frame Construction

MAIN STUD

HEADER – 4" x 4" OR

 

JACK STUDS

2 - 2" x 4" ON EDGE

 

16-1/4" MIN. RAB71

16-1/2" MIN. RAB77

ADJUSTABLE FRAMING TO SECURE

THIS DIMENSION

42-1/4" MIN. (RAB71)

42-3/8" MIN. (RAB77)

JACK STUD

CRIPPLE

FINISHED FLOOR

SUB-FLOOR

Note: Do not remove the stiffener support from inside the wall case until the chassis is to be installed.

Figure 1

FASTENING WALL CASE

MAIN STUDS

HEADER

JACK STUD

LINTEL

MOUNTING

SCREW HOLE

Framing detail for this construction is as shown in Figure 1. Note use of lintel under first course of brick above the Zoneline case. Do not use the case as a lintel. Mounting screw holes shown are to be made by the installer.

NO HOLES PERMITTED IN BOTTOM OF CASE (EXCEPTION -RAD10

DRAIN KIT)

 

WOOD

MOLLY

EXPANSION

 

SCREW

OR TOGGLE

ANCHOR

 

 

BOLT

BOLT

 

NO HOLES PERMITTED IN

 

2" MIN.

BOTTOM OF CASE

 

 

(EXCEPTION - RAD10

 

 

DRAIN KIT)

 

Choice of attachment devices

 

 

 

 

JACK STUD

 

through both ends of case or the

 

 

top. Mounting screw holes and

 

 

 

attachment devices by installer.

MAIN STUD

Figure 2

Page 26
Image 26
GE 2800 manual Framing For Wall Case, Fastening Wall Case, Brick Veneer and Frame Construction