GEK-91696D

 

 

 

 

 

 

 

inchesforV-beltapplication.

 

 

 

 

 

 

 

 

1150HPWhereACDrillDing=MiniMotor,Modelsheave5GEB22pitchdiameter

 

 

 

 

 

 

 

 

 

 

HP/RPM=

 

mumratioofhorsepower,includingoverloads,tothespeedwhichthatpoweroccurs.

 

 

 

 

 

W=Maximumallowableradialload.

 

 

 

andconst

belttensionis

asilymaintained

 

 

 

Be

−drivenmachinesmaybeequippedwithslidingrails.Pr

 

 

CAUTIObenN:eOvercorectly−tighteningadjusted,toavoidthebeltsandthisslippagepulleysmayhaveresultnotbeeninearlychosfilreseratingproperlyofmethodbelts,fullccurstheshafts,job.andbearings.

 

 

 

Sliding

 

 

andthereplacementofbeltsis

 

.Thisreducestheoperatingcostan

 

increasesthefficiency.e

 

 

B

ltidlersreducethelifeofthebeltssimplifieda shouldnotbeusedifanyother

 

is

 

.Thebltsshould

 

 

raisaretobeusedforfloormountingonly.

 

 

 

 

 

availablefterthebeltthensionhas

 

 

shouldbeadjusteduntilonlyavesslightbowappersintheslackside.Ifslippage

 

 

 

 

nverbeforcedoverthes

 

.Whenthedriveisstartedandp

Informationspeedndfullload,

take−up

 

 

B

 

 

 

shouldbecheckedandadjustedfollowingthebeltmanufacturer’s

 

 

 

.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Theretensionis

adropintensionduingthefirst24to48hoursofoperation.recommendationsDuringthis"r in"priod,the

 

 

afterseatayormallytwoofperation.

 

 

 

andinitial

isremoved.Belttension

 

berechecked

 

 

belts

 

themselvesin

sheavegoovesr

 

 

 

clean

beltsrunsmoother,lookbetter,andlastlonger.Long

beltliferesultsifthebeltsa

sheavesarekept

 

1.4.6.3.

 

thebeltsarepreventedfromrubbingagainstthestretchbltguardsorotherobstructioshouldn.

 

 

 

 

 

 

MatchedGouigand

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1.4.6.4.OnAistotopuddlLeveshouldFxrich,giveoncbealldnonbeaprepaedretemountingundestiffC−shrinkfoundations,mixtureplngAlignmtheProprietarygroutbasebasethe.The.site,supportsshouldclean,minimumcementProcbebutbeforeusedderoughof−sand.onesettingHighsurfaceinchratio−gradethe(25ofofbasemm)1:2thegroutisinshouldfoundationrecommpositionmixtursbeeallowed.ndedshouldBeforeare.availableJustforgroutingbewtenoughgroutingcommerciallyandthewater.thebase,groutrammedshouldthe.Ifalignmentthebegroutusedor

 

1

Removecheckedall

ngfollows:boltsndslidetheshellsbackso

hbfacesareexposed.

 

 

2Chek

couplinghubspacingisinaccordancewiththeoutlinedimensionswiththeunitsinthemecan-

 

3.

icalcenteroftheirendplay.

thelargestunit(usually

 

ornearthemidleofmultipleunits.Check

 

 

wthethecouplingnext

 

12

4.

 

atorto

hubndusetheoutsidediameerofthemotor)her

to

indcationofthemisalign-

anInsertrotationmStartindicximum270felerin90dgreessurevariationmentdegreeinremntsgagedialorshouldreorduseindicatorthenot.Rotexceedauntilteindicatorbothfivesets0.002inchesshaftsathuboftogetherrefcesa(0dings.05mm).90Measureartakndgreandrepat.sincememberthe.Thegapfifthbtweengivesettheofgaphubreadingsreadingsfacesreadingsisat.0,checkContinue90,180

 

 

the

dialalig

the

byusing

straightedgeacrossthetwoubsatverticalandhorzontal.O,clap

dial

 

 

ent.Be

 

 

supportsdonotbendorsag,

thiswill

inaccurate

.The

Page 12
Image 12
GE 5GEB22 manual Belts, Atorto, Thiswill, Clean, Andconst