GEK-91696D

 

 

Model5GEB22

 

 

 

 

 

 

 

 

 

1150HPACDrilling

 

 

 

 

 

 

 

 

 

-

 

NOTE:InorderMotor,maintainATEXapproval,onlyGETransportationoriginalpartsshallbeusedasreplace

 

mentparts.

 

 

 

 

 

 

 

 

 

 

 

 

4.1.1.Covers,MONTHLYSeals,SCHEDULEDand tchesMAINTENANCEPROCEDURE

 

 

 

 

 

 

 

WARNING:Hazardousvoltagesarepresent thisequipment.Followshutdownprocdurestoensurepower

 

snotappliedtothemachinebeforeperforminganymaintenanceprocedures.Failurtoe

dosomayresultin

 

injuryordeath.

 

 

 

 

 

beforeattemptingmaitenanceprocedures.

 

 

 

 

 

1Removeallpowerfromthe

 

 

 

 

 

 

2.

Cleantheoutsideofthem

 

andremovetheinspectioncovers.

particles

 

presentahazard

WARNING:Whenusngcom

dairmachineforeaning

flyingdebris

 

 

equipmentasspecifiedmmediateby licablefederaorPersonnelstatepurposes,safetyegulations.Failuretodosomayresultininjuryor

death.3

clean,dry

mpressd

andblowthedirtanddustfrom

interiorofthemachine.

 

 

topersonelin

the

 

 

area.

 

shouldbeovidedwith,

andtrainedintheuseof,protective

 

5.

Useend.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Installthecovcoversintopositiononthemachine.Torquethecoverboltsto58±2lb.–ft.(79±2,7Nm).

orhard-

4.1.2.

4Chckexterior

 

toensueair

thefeltsealsareintact.Rplacethesalsifmissing,broken,deformed

PowerCableInspection

 

 

 

 

 

 

 

 

 

 

 

3Inspect21InspectDuringEnsuread/orInspectinspectiontheterminalcablepowerthecablecableconnectionifinsulaofcabldamageconnectinstheterminalspowerfor:forfoundforcracked,cablesareiscoloration.tightandworn,cut,andassociatedarcingisfrombubbledheat,notrdware,arcpresentorburntdamage,replace.insulationcracksanycomponents.orReplacefracturesthe.thatcableReplaceareifdamagedamagedterminalsis.

 

4

found.cable

 

bushingsandmountinghardware(suchascablecleats).Replacedamagedormiss-

 

 

inghardware.

 

 

 

 

 

 

 

 

 

 

 

14

5.Ceckthegroundcableconnectiontothemotorframe.Ensuretheconnectionistightonthegroundstud.

1.briscontamination,MegohmmetersystemEnsurereadingalltheforindicatesmegohmmeterconditionmpnentscarbonrackngodinsulatontesttheinstrumentprocedupower.qualityTotestthecircuitare.Loworapplieddisconnectohmwernotreadingsdeterminedcircuitaffectpowinsulationwithindicatecablesbymegohmmeterinsultionfromathemegohmmeter:drivesystembreakdwn,testmo.Check.moisture/deIfcablesthedrivear-

4.1.3.

T

insulation

Test

ofthemoorandcablescanbe

by

 

 

.Whenhe

 

voltageofthe

 

 

est

 

is

tothepowercomponentsofthe

orcircuit,ahigh

Page 14
Image 14
GE 5GEB22 manual PowerCableInspection, Orcircuit,ahigh, 1150HPACDrilling, Voltageofthe Est, Tothepowercomponentsofthe