GEK1150-91696DHPACDrillingMotor,Model5GEB22

LARGEST BEARING CAP

BOLT SPACE TO BE AT

6 O’CLOCK POSITION WHEN FRAME HEAD (27)

IS ASSEMBLED TO FRAME (21)

E-50831

 

2.

Figure13.CEFrameHeadandCEBeringCapAlignment.

Levelthe

frameothat

 

Mountthestatorf

in

avy–duty

withthe

End(DE)up.

 

3

Allowenughclearancefort

guidetudsstandtherotorDriveass

mblytoextendapproximtelystator

8inches(203

 

mm)beyondtheoftheCEframestatorheadframe(27)(21)isfreeofdamageandburrsintheframeheadfit.

 

 

4

therotorcanbeloweredvericallyntotheframewithahoitwithoutdamagingtheberingsorburings.

36

EnsuretheDEframehead(11),moutedontherotorshaft,isfreeofdamageandburrs.

 

5.

remainRemovealignedtheCEonouerthedummyinnerbearingncapgcap(35)from.

theendoftherotorshaft.TheinboardCEgasketmust

Page 36
Image 36
GE 5GEB22 manual Levelthe, Withthe, Avy-duty, Mountthestatorf, Frameothat