GE AEQ24, AEV24, AEW24, AEH24 INSTALL THE CASE IN THE WINDOW cont, Window Installation Instructions

Models: AEH24 AEW24 AEQ24 AEV24

1 40
Download 40 pages 997 b
Page 13
Image 13
6INSTALL THE CASE

Window Installation Instructions

6INSTALL THE CASE

IN THE WINDOW (cont.)

DUse a wood block (obtained locally) between the leveling bolts and the wall if the wall is weak or if the weight of the air conditioner falls between the studs in the wall.

EAdjust the leveling bolts and nuts against the outside wall so that the case has a slight tilt to the outside. Tighten nuts with an adjustable wrench. Use a level; no more than a 1/2 bubble will be the correct case slant to the outside.

FExtend the left and right accordion panels to the vertical window sashes. Drill pilot holes and attach the top and bottom corners with 4 type D screws.

 

Top mounting rail

Type D

 

screw

Type D

 

screw

Type D

 

screw

 

 

Type D

 

screw

7INSTALL SUPPORT BRACKETS AND THE FOAM TOP WINDOW GASKET

ADrill pilot holes and attach the support brackets with two type D screws, one on each side.

BCut the foam top window gasket to the window width.

CStuff the foam between the glass and the window to prevent air and insects from getting into the room.

13

Page 13
Image 13
GE AEQ24, AEV24, AEW24, AEH24 INSTALL THE CASE IN THE WINDOW cont, Install Support Brackets And The Foam Top Window Gasket