GE 10 AZA Operating Instructions Safety, Read these instructions completely and carefully

Models: 10 AZA AJGS 06 LZA, AJGS 08 AZA, AJGS 10 AZA, AJES 06 LSA, AJES 08 ASA, AJES 10 DSA, AJHS 08 ASA

1 28
Download 28 pages 38.77 Kb
Page 14
Image 14
Operating Instructions Safety

Instructions

Installation for models AJES and AJHS—with filler panels.

Read these instructions completely and carefully.

Operating Instructions Safety

6

Measure, Cut and Install the Filler Panels

AMeasure from the edge of the panel marks

(see Prepare the Window) to the inside of the window track on each side. (A and B)

Sill

 

 

Window track

 

 

1338

1338

 

A

Width of the air conditioner

B

Left side

 

(panel marks)

Right side

 

 

 

Mark the A and B measurements on each

B

 

side of the filler panel board. Cut the panels

 

Gasket

Angle

Gasket

Panel

 

Tab

Angle

Type C (painted screws)

Instructions Care and Cleaning

and discard the center piece. Note position

of the notches.

B

A

Right side

Left side

are(holeson the left)

(holes areontheright)

 

Filler Panels

 

Cut panels

 

and discard

 

center piece

DInstall the panels in the window. Place the spring clips 3″ from the top and the bottom. Squeeze and push the clips to fit in the window track and the tab into the sill support.

Instructions Care and Cleaning3

Consumer Support Troubleshooting Tips Installation

C

Put together the panel assemblies. Remove

 

 

the paper backing from the case side gasket

 

 

and attach it to the angle. Push a pencil point

Hook the tab into the

 

through the gaskets to locate the holes in

 

sill support

 

the angles.

 

14

Page 14
Image 14
GE 10 AZA Operating Instructions Safety, Read these instructions completely and carefully, Instructions Care and Cleaning