GE ASQ28 owner manual 1IMPORTANT cont, 2FINISH THE WALL OPENING

Models: ASQ28

1 36
Download 36 pages 30.29 Kb
Page 13
Image 13
1IMPORTANT

Through-the-Wall Installation Instructions—Optional

The case may be installed through-the-wall in both existing and new construction.

Read completely, then follow step-by-step.

NOTE: Except for the V-support assemblies (included), obtain all materials locally for mounting the air conditioner through-the-wall.

1IMPORTANT

Through-the-wall installation is not appropriate if any of the side or top louvers in the case will be obstructed by the wall.

All side and top louvers in the case must project on the outdoor side of the wall.

The room side of the case must project into the room far enough to maximize the balance of the unit.

The case must be installed level from side- to-side and with a slight tilt from front to rear. Use a level; no more than a 1/2 bubble will be the correct case slant to the outside.

Lintel angle is required to support bricks or blocks above opening.

Flashing is required and should extend the length of the opening to ensure no inside cavity leakage occurs.

A Remove the air conditioner from the case.

For specific instruction, refer to the Window

Installation Instructions.

B Make certain that a wall receptacle is

1IMPORTANT (cont.)

DSecure with 14 wood screws anchored at least an inch into the wall support structure.

NOTE: Drill pilot holes, if necessary, for proper installation. If the frame is oversized, use shims to prevent case distortion.

EInstall the V-supports. See the INSTALL THE CASE IN THE WINDOW section in the Window Installation Instructions.

2FINISH THE WALL OPENING

ACaulk all four sides on the outdoor side of the case to prevent moisture from getting through to the interior wall. Use of flashing (drip rail) will further prevent water from dripping inside the wall and down the outside of the building.

 

Plaster line

Lintel angle

 

Caulking

Trim molding

(if desired)

 

OUTSIDE

INSIDE

 

Air louvers

Bottom rail

(top and

 

sides must

 

project on the

 

outdoor side

 

of the wall)

 

available close to the hole location or

make arrangements to install a receptacle.

Wood filler and caulking (above and below the flashing)

V-supports

Flashing (Drip rail)

Case Bottom bottom rail

CPlace the case in the wall opening and place wood support strips between the case bottom and the flashing on both sides of the bottom rail. They should be the same height as the bottom rail and the same length as the wall opening.

Flashing

(Drip rail)

Wood support strips

BPlace the air conditioner into the case.

For specific instruction, refer to the Window Installation Instructions.

13

Page 13
Image 13
GE ASQ28 owner manual 1IMPORTANT cont, 2FINISH THE WALL OPENING