GE ASS05, ASV08, ASM06 Installation Instructions, 1WINDOW REQUIREMENTS, 2STORM WINDOW REQUIREMENTS

Models: ASS05 ASQ08 ASQ06 ASV06 ASM06 ASV08

1 36
Download 36 pages 60.31 Kb
Page 11
Image 11
1WINDOW REQUIREMENTS

Installation Instructions

1WINDOW REQUIREMENTS

These instructions are for a standard double-hung window. You will need to modify them for other types of windows.

All supporting parts must be secured to firm wood, masonry or metal.

The electrical outlet must be within reach of the power cord.

Models ASQ05, ASS05, ASV05, ASQ06, ASV06 only

(See below illustration for Models ASM05, ASM06,

ASQ08 and ASV08.)

2STORM WINDOW REQUIREMENTS

A storm window frame will not allow the air conditioner to tilt toward the outside, and will keep it from draining properly. To adjust for this, attach a piece of wood to the stool.

WOOD PIECES–

WIDTH: 2

LENGTH: Long enough to fit inside the window frame.

THICKNESS: To determine the thickness, place a piece of wood on the stool to make it 1/2higher than the top of the storm window frame or the vinyl frame.

Attach securely with nails or screws provided by the installer.

13min.

22to 36

(With accordion panels)

Models ASM05, ASM06, ASQ08 and ASV08 only

(See above illustration for Models ASQ05, ASS05,

1/2higher 2STORM WINDOW REQUIREMENTS than storm window WOOD PIECES– frame

Storm window frame

1/2higher

than vinyl frame (on some windows)

3PREPARE AIR CONDITIONER Wood

Stool

Vinyl frame

ASV05, ASQ06, ASV06.)

1312min.

2412to 36

(With accordion panels)

3PREPARE AIR CONDITIONER

ARemove the backing from the top mounting rail seal strip and attach it to the bottom of the top mounting rail. Cut to size.

BInstall the top mounting rail with 3 or 4 type A screws (depending on the number of holes in the top mounting rail) from the outside of the case.

Top mounting

rail

Bottom mounting rail Manual background

11

Page 11
Image 11
GE ASS05, ASV08 Installation Instructions, 1WINDOW REQUIREMENTS, 2STORM WINDOW REQUIREMENTS, 3PREPARE AIR CONDITIONER