Installation Instructions
FLUE TERMINAL CLEARANCES (ANSI Z21.10.3 • CSA 4.3) |
| |||
| G |
|
|
|
|
|
|
| H |
| A |
|
|
|
|
|
|
| M |
|
|
|
| I |
D |
|
| B | K |
|
| FIXED |
| |
|
|
|
| |
E |
| B | CLOSED |
|
|
| OPERABLE |
| |
|
|
|
| |
B | C | B |
|
|
|
|
| ||
| FIXED |
| J |
|
| CLOSED |
| B |
|
| OPERABLE |
| A |
|
L |
|
|
|
|
| F |
|
|
|
| B |
|
| VENT TERMINAL |
|
|
|
| |
|
|
|
| AIR SUPPLY INLET |
|
|
|
| AREA WHERE |
|
|
|
| TERMINAL IS NOT |
|
|
|
| PERMITTED |
ADDITIONAL CLEARANCES – VENT TERMINAL
Local codes supersede these clearances.
•Avoid termination locations near a dryer vent.
•Avoid termination locations near commercial cooking exhaust.
36" | * | (0.91 m) to ventilated or unventilated soffit or eave vent; or |
|
| to a deck or porch |
12"
(0.30 m) to an inside corner
2"
(50 mm) between terminals at same level
INSIDE
CORNER
6