GE JBP26 Prepare the Opening, Read these instructions completely and carefully, 3 0 ″, 15 ″

Models: JBP25 JBP19 JBP21 JBP24 JBP22 JBP26 JBP30

1 44
Download 44 pages 43.73 Kb
Page 29
Image 29
1 Prepare the Opening

Read these instructions completely and carefully.

1 Prepare the Opening

Allow 112″ spacing from the range to adjacent vertical walls above cooktop surface.

Allow 30″ minimum clearance between surface units and bottom of unprotected wood or metal top cabinet, and 15″ minimum between countertop and adjacent cabinet bottom.

EXCEPTION: Installation of a listed microwave oven or cooking appliance over the cooktop shall conform to the installation instructions packed with that appliance.

If cabinet storage is installed, reduce risk by installing a range hood that projects horizontally a min. of 5″ beyond the bottom of the cabinets. Make sure the wall covering, countertops and cabinets around the range can withstand heat generated by the range, oven or cooktop up to 200°F.

 

 

 

 

Not less than the width

 

 

 

 

of the range

 

 

 

Hood

 

 

 

 

5Min.

 

30

15

 

 

 

Min.

Min.

 

 

 

 

 

 

Locate the outlet box within either shaded area.

Wall

 

 

 

 

 

112

 

 

 

 

Min.

C of range

 

 

 

 

 

 

L

 

 

 

Wall

712

 

 

 

Outlet box

7

712

143 ⁄4

 

312

 

 

 

 

5

 

 

 

 

 

 

 

 

Floor

 

 

 

Install the

214

 

 

Cord

outlet box on

 

 

 

 

either side

 

 

 

 

of the C

 

 

 

 

L

 

 

 

 

Anti-Tip Bracket (install

 

 

 

in either rear corner)

 

Safety Information Operating Instructions Installation Instructions Troubleshooting Tips Customer Service

29

Page 29
Image 29
GE JBP26 Prepare the Opening, Read these instructions completely and carefully, Not less than the width, 3 0 ″, 15 ″