GE JKP90, JTP90 Installation Instructions, C3Preparing for the Bottom Trim Installation

Models: JTP90 JKP90

1 24
Download 24 pages 49.23 Kb
Page 10
Image 10
C3 Preparing for the Bottom Trim Installation

Installation Instructions

C3 Preparing for the Bottom Trim Installation

a. With oven installed, take the bottom trim and center it on the bottom front edge of the cabinet opening.

b. Using the trim

For 27(68.6 cm)

 

models with Lower

 

as a template,

 

Trim in Position,

 

mark the center

Mark (2) Mounting

 

of each slot

Hole Locations here

 

 

 

(two total) where

 

 

 

the mounting holes

 

 

will be drilled.

 

 

*

c. Remove the trim.

 

* Remove

For 30(76.2 cm)

 

 

models with

d. Drill pilot holes into

Lower Trim

Lower Trim in

Before

the center of each

Position, Mark (2)

Pre-drilling

Mounting Hole

template mark.

 

Mounting

 

Locations here

 

 

Holes

 

C4 Installing the Metal

Bottom Trim

a. Place the bottom metal trim centered over the pre-drilled mounting holes. Tape the edges of the trim down to maintain the alignment.

b. Using two trim screws provided, secure the bottom trim to the bottom edge of the cabinet.

Trim Screw

 

Locations for

Side

27(68.6 cm)

Trim

models with

 

Lower Trim

 

Side

 

Trim

 

Metal Lower Trim

Trim Screw Locations for 30(76.2 cm) models with Lower Trim

IMPORTANT: If this unit is ever removed from the cabinet or the oven is ever pulled out for service, the trim must be removed first or damage to the trim will occur.

10

Page 10
Image 10
GE JKP90 Installation Instructions, C3Preparing for the Bottom Trim Installation, C4Installing the Metal Bottom Trim