Installation Instructions

INSTALLING THE WATER LINE (ON SOME MODELS)

BEFORE YOU BEGIN

Recommended copper water supply kits are WX8X2, WX8X3 or WX8X4, depending on the amount of tubing you need. Approved plastic water supply lines are GE SmartConnectRefrigerator Tubing (WX08X10002, WX08X10006, WX08X10015 and WX08X10025).

When connecting your refrigerator to a GE Reverse Osmosis Water System, the only approved installation is with a GE RVKit. For other reverse osmosis water systems, follow the manufacturer’s recommendations.

This water line installation is not warranted by the refrigerator or icemaker manufacturer. Follow these instructions carefully to minimize the risk of expensive water damage.

Water hammer (water banging in the pipes) in house plumbing can cause damage to refrigerator parts and lead to water leakage or flooding. Call a qualified plumber to correct water hammer before installing the water supply line to the refrigerator.

To prevent burns and product damage, do not hook up the water line to the hot water line.

If you use your refrigerator before connecting the water line, make sure the icemaker power switch is in the O (off) position (on power switch models) or the feeler arm is in the STOP (up) position (on feeler arm models).

Do not install the icemaker tubing in areas where temperatures fall below freezing.

When using any electrical device (such as a power drill) during installation, be sure the device is double insulated or grounded in a manner to prevent the hazard of electric shock, or is battery powered.

All installations must be in accordance with local plumbing code requirements.

WHAT YOU WILL NEED

Copper or GE SmartConnectRefrigerator Tubing kit, 1/4″ outer diameter to connect the refrigerator to the water supply. If using copper, be sure both ends of the tubing are cut square.

To determine how much tubing you need: Measure the distance from the water valve on the back of the refrigerator to the water supply pipe. Then add 8′

(2.4 m). Be sure there is sufficient extra tubing (about 8′ [2.4 m] coiled into 3 turns of about 10″ [25 cm] diameter) to allow the refrigerator to move out from the wall after installation.

GE SmartConnectRefrigerator Tubing Kits are available in the following lengths:

2′ (.6 m) – WX08X10002

6′ (1.8 m) – WX08X10006

15′ (4.6 m) – WX08X10015

25′ (7.6 m) – WX08X10025

Be sure that the kit you select allows at least 8′ (2.4 m) as described above.

NOTE: The only GE approved plastic tubing is that supplied in GE SmartConnectRefrigerator Tubing kits. Do not use any other plastic water supply line because the line is under pressure at all times. Certain types of plastic will crack or rupture with age and cause water damage to your home.

14

Page 14
Image 14
GE MODELS 18 AND 19 Installing the Water Line on Some Models, Before YOU Begin, What YOU will Need

MODELS 18 AND 19 specifications

The GE Models 18 and 19, developed by General Electric, represent significant advancements in the realm of gas turbine technology, particularly for power generation applications. Catering to the needs of utility companies and industrial users, these models stand out due to their robust design, efficiency, and reliability.

The GE Model 18, introduced in the mid-20th century, utilizes a simple yet effective gas turbine architecture. It operates on a basic Brayton cycle, forming the foundation for subsequent turbine designs. A key feature of the Model 18 is its high-pressure ratio, which allows for enhanced thermal efficiency compared to earlier models. The turbine is designed with multipoint fuel injection systems that improve combustion performance by providing a more uniform fuel distribution. Additionally, the Model 18 features advanced cooling techniques, such as air-cooled components and advanced materials that withstand high temperatures, helping to prolong the operational life of the turbine.

On the other hand, the GE Model 19 built upon the successes of its predecessor and introduced several innovative technologies. One of its standout features is its capacity for variable turbine geometry, which optimizes performance across a wide range of operating conditions. This adjustment allows the turbine to achieve higher efficiency during part-load operations, a crucial capability in today's energy market where demand can fluctuate significantly.

The Model 19 also integrates state-of-the-art control systems that enhance operational reliability and efficiency. These sophisticated systems allow for precise monitoring and adjustments to combustion parameters, reducing emissions and improving fuel consumption. Furthermore, the utilization of advanced digital technology aids in predictive maintenance, allowing operators to proactively address potential issues before they escalate into costly downtimes.

Both models feature a modular design, making maintenance and upgrades simpler and more efficient. This design philosophy reduces the time required for servicing, enabling plants to maintain higher availability and productivity. Moreover, the robust construction of the turbines ensures durability and performance even in challenging environments.

In summary, the GE Models 18 and 19 embody a blend of reliability, efficiency, and advanced technology, positioning them as vital assets in the generation of power. With features that cater to evolving energy demands and sustainability goals, these turbine models continue to play a significant role in the energy sector.