GE r10279v Design Guide, The Installation Space, Product Clearances, Side-By-Sideinstallations

Models: r10279v

1 8
Download 8 pages 55.84 Kb
Page 3
Image 3
Design Guide

Design Guide

THE INSTALLATION SPACE

 

Locate

 

 

Outlet

 

 

10-1/2"

24"

34-1/2"-35"

9" Max.

 

 

1-1/2"

24-1/8" Framed Models

 

23-3/4" Stainless Steel Models

 

23-3/4" Min.

 

 

 

NOTE:

34-1/4"

 

Handle

to 34-3/4"

 

 

and handle standoff depth is 1-3/4

23-3/4"

The cutout depth should be 24

The cutout dimensions shown allow for a full door swing and access to the pull-out racks when installed as a built-in in standard 24deep cabinets.

The wine chiller, wine reserve and beverage center can be installed freestanding.

If installing between frameless cabinets, a 1/2wide filler strip or side panel may be needed on hinge side. The filler strip will act as a spacer between the case and adjacent cabinet door swing. The width

of the opening must include the filler panels. NOTE: The door should protrude 1beyond the

surrounding cabinets. Custom framed models will protrude 1-7/8beyond surrounding cabinet doors.

Additional Specifications

A 120 volt 60Hz., 15 or 20 amp power supply is required. An individual properly grounded branch circuit or circuit breaker is recommended. Install a properly grounded 3-prong electrical receptacle recessed into the back wall as shown. Electrical must be located on rear wall as shown. NOTE: GFI (ground fault interrupter) is not recommended.

PRODUCT CLEARANCES

The stainless steel wine chiller, wine reserve and beverage center is factory set for a 110° door swing. Models that accept custom panels have a 95° door swing.

When installed in a corner:

Allow 4min. clearance on the hinge side for the 90° door swing and to allow racks to slide out.

Allow 10minimum clearance on the hinge side for a full

110° door swing. (Models ZDWI240WII and ZDBI240WII have a 95° door swing.)

NOTE: Custom handle clearances may vary, depending on custom handle depth.

10" Minimum

90° Door Swing

to Wall

 

 

21-5/8"

23-5/8"

90°

110°*

 

4" Minimum

*95° Door Swing on Custom Frame Models

to Wall

The door swing is reversible on all models. If desired, change the door swing before installation or before installing the custom frame panel.

Choose the location:

These products may be closed in on the top and three sides as long as the front is unobstructed for air circulation and proper access to the door.

Do not install these products where the temperature will go below 55°F (13°C) or above 90°F (32°C).

Do not install where it will be subject to direct sunlight, heat or moisture.

These products are not designed to be stacked one over the other.

Black or Stainless Steel Toekick Options

These products are shipped with a black toekick installed. An optional stainless steel toekick is also supplied with each product. For shipping purposes, the stainless steel toekick is secured to the back of the unit.

ZTBSS1 Tubular Handle

ZTBSS1 Monogram stainless steel tubular handle is available for models ZDWI240WII and ZDBI240WII.

SIDE-BY-SIDE INSTALLATIONS

Increase storage capacity by installing two Monogram

beverage centers, wine chillers or wine reserves together.

 

 

 

 

 

 

 

 

 

 

Locate

 

 

 

 

 

 

 

 

 

 

 

Outlet

Or, for a complete refreshment center, install any two

 

 

 

 

 

 

 

 

 

 

 

 

 

10-1/2"

 

 

14"

 

10-1/2" 24"

of these units together.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• A side-by-side installation requires at least a 47-1/2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

34-1/2"-35"

9"

 

9"

 

 

 

 

 

 

 

wide opening. No trim kits required.

 

 

 

 

15"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1-1/2"

 

 

• Products must operate from separate, properly

 

 

 

 

 

 

 

47-1/2" Min.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

grounded receptacles.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3

Page 3
Image 3
GE r10279v Design Guide, The Installation Space, Product Clearances, Side-By-Sideinstallations, Additional Specifications