Installation Preparation

PRE-INSTALLATION CHECKLIST

1.When preparing cooktop opening, make sure the inside of the cabinet and the cooktop do not interfere with each other. (See section on preparing the opening.)

2.Slide the cooktop out of the end of the box. Remove packaging materials, grate boxes, regulator and literature package from the cooktop before beginning installation.

Use the shipping carton as a pad to protect customer countertops or flooring.

Foam support

Left and right side

grate boxes

Regulator

Center

Foam

taped to the

grate box

packaging

underside

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3.Remove Installation Instructions from literature package and read them carefully before you begin.

Be sure to place all literature, Owner’s Manual, Installations, etc. in a safe place for future reference.

4.Make sure you have all the tools and materials you need before starting the installation of the cooktop.

5.Your home must provide the adequate electrical service needed to safely and properly use your cooktop. (Refer to section on electrical requirements.)

6. When installing your cooktop in your home, make sure all local codes and ordinances are followed exactly as stated.

7.Make sure the wall coverings, countertop and cabinets around the cooktop can withstand heat (up to 200°F) generated by the cooktop.

6

Page 6
Image 6
GE ZGU385N, ZGU385L installation instructions PRE-INSTALLATION Checklist