Functional Test

Installation (cont’d)

cover (or close the cabinet door). DANGER LED goes off, and the S2 position LED illuminates.

HAZARDOUS VOLTAGE

(Can Cause Severe Injury or Death)

Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.

Functional Test

Functional testing of the automatic transfer switch (ATS) is described in this section. Before proceeding, read and understand all instructions and review the operation of all accessories provided.

To begin the test, close the Utility source circuit breaker. Referring to Figure 7, the controller will illuminate the

Utility Available LED when proper voltage is sensed. If the ATS mechanism is set on S1, the S1 position LED will also light.. Verify the phase to phase voltages at the Utility line terminals.

Next, close the Generator source breaker and start the engine generator. The S2 (Generator) Available LED will illuminate when proper voltage and frequency levels are sensed. After both sources have been verified, shut down the engine generator, and put the generator’s start control in the automatic position. Complete the visual inspection of the transfer switch, and replace the cabinet

cover (or close the cabinet door).

Simulate a utility outage by opening the S1 Utility side breaker. The delay to engine start timer (P) begins its timing cycle. After the P timer has completed its timing cycle, the engine start contacts close to start the generator.

When generator voltage and frequency reach the preset restore points (see Table 4) the S2 Available LED illumi- nates. Simultaneously, the delay to generator timer (W) begins its timing cycle. When the W time delay is com- pleted the ATS will transfer to Generator, the S1 position

LED goes off, and the S2 position LED illuminates.

Reclose the Utility breaker to retransfer to utility. The delay to utility timer (T) begins its timing cycle (Table

3). When the T timer has completed its timing cycle, the ATS will transfer. The optional S2 position LEDs go off, and the S1 position LED illuminates. The delay engine stop timer (U) begins its timing cycle. The generator runs unloaded for the duration of the U timing cycle. When the timer completes its timing cycle, the generator

will stop. The S2 Available LED goes off.

ATS Timing Cycle

Action

P Timer

W Timer

T Timer

U Timer

 

P - 5 sec.

W - 20 sec.

T - 5 min.

U - 5 min.

S1 Fail or

Time Delay

Time Delay

Time Delay

Time Delay

Test or

S2 Start

S2 Stable

S1 Stable

S2 Stop

Exerciser

 

 

 

 

 

Transfer to S2

Retransfer to S1

Engine Cool-Down

S1 returns or Test/Exerciser Ends

Table 3

Preset Settings

Utility

Generator

S1 Fail Voltage

80% Nominal Line Voltage

S2 Fail Voltage

80% Nominal Line Voltage

S1 Restore

90% Nominal Line Voltage

S2 Restore Voltage

90% Nominal Line Voltage

S1 Fail Frequency

80%

S2 Fail Frequency

90%

S1 Restore Frequency

90%

S2 Restore Frequency

95%

 

 

 

 

 

Timers

 

P Timer

W Timer

T Timer

U Timer

P - 5 sec.

W - 20 sec.

T - 5 min.

U - 5 min.

Table 4

GE Zenith Controls

ZTX Operation and Maintenance Manual (72R-1000)

5

Page 7
Image 7
GE ZTX manual Functional Test, ATS Timing Cycle, Preset Settings, Installation cont’d, Danger, Hazardous Voltage