Generac Power Systems 004992-0, 004992-1, 37kW NG, 40kW LP owner manual 3.6AUTOMATIC OPERATION

Models: 004992-0, 004992-1 004992-1, 004992-0 004992-0, 004992-1, 37kW NG, 40kW LP

1 48
Download 48 pages 1.17 Kb
Page 17
Image 17
3.5RETRANSFER AND SHUTDOWN

3.5RETRANSFER AND SHUTDOWN

When utility power source voltage has been restored, electrical loads may be transferred back to that source and the generator can be shut down as fol- lows:

Verify that utility power supply voltage to the trans- fer switch has been positively turned Off, using whatever means provided (such as utility main line circuit breaker).

Set the generator’s main circuit breaker to its OFF or OPEN position.

Let the generator engine run at no-load for a few minutes, to stabilize internal unit temperatures.

On the generator console, set the AUTO/OFF/ MANUAL switch to OFF. Wait for engine to come to a complete stop.

For transfer to utility position, refer to the Owner’s Manual of the particular transfer switch.

Turn on the utility power supply to the transfer switch, using whatever means provided (such as a utility main line circuit breaker). The utility power source now powers the loads.

Section 3 - Operation

Guardian 40kW Liquid-cooled Generators

If DC power to the control board is lost, the weekly exercise setting will be lost. This is indicated by all five red LEDs continually flashing. In this state the generator will still start and run in manual mode, or automatically start and run if UTILITY is lost while in AUTO mode, but it will not perform a weekly exercise cycle.

If a failure occurs while running in this mode, the five red LEDs will stop flashing, the individual fault LED will turn on and the engine will shut down. Once the AUTO/OFF/MANUAL switch has been switch to OFF, the individual fault LED will turn OFF and the five red LEDs will begin flashing to show exercise has still not been set.

Figure 3.2 - “Set Exercise Time” Switch

 

 

S

 

 

 

S

 

FUSE

F

U

F

 

F

U

F

 

S

 

 

S

E

 

E

 

 

 

 

FUSE

 

 

U

4A

 

S

E

 

S

E

 

U

 

15A

 

U F

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BAT.MAIN

CHARGER

3.6AUTOMATIC OPERATION

To set the system for fully automatic operation, pro- ceed as follows:

Check that load circuits are connected to the utility power supply.

Set the AUTO/OFF/MANUAL switch to its AUTO position.

Set the generator main circuit breaker to its ON or Closed position.

3.7WEEKLY EXERCISE CYCLE

The engine control board will start and run the gen- erator once every seven days for approximately 12 minutes. If utility should fail during this exercise period, the engine control board will transfer the load to the generator output and continue to run until util- ity returns.

On the day, and at the time of day chosen for the gen- erator to exercise, set the weekly exercise cycle as fol- lows:

1.Place the AUTO/OFF/MANUAL switch in the AUTO position.

2.Press and hold the “Set Exercise” switch for three seconds, then release.

At this time all five red LEDs will flash for approxi- mately 10 seconds, then the engine will start and run for it’s 12 minute exercise period, then shut down. The generator will now start and run each week at the same time.

 

AUTO

OFF

 

 

OFF

ON

 

SET

MANUAL

EXERCISE

 

TIME

 

Generac® Power Systems, Inc. 15

Page 17
Image 17
Generac Power Systems 004992-0, 004992-1, 37kW NG, 40kW LP owner manual 3.6AUTOMATIC OPERATION, 3.7WEEKLY EXERCISE CYCLE