14. Fill crankcase with approxi- mately 116 fluid ounces of Gi- ant oil or equivalent SAE 90 industrial gear oil and check oil level of the crankcase with the dipstick. Proper level is center of two lines. Reinstall your Gi- ant LP pump into your system.
12.Next, place valve assemblies (46A) into manifold after first lubricating the
13.Replace plug with
Position | Item# | Description | Torque Amount |
10 | 01010 | Screw, Cover | 125 |
17 | 07114 | Hex Screw, Bearing Cover | 125 |
24A | 13277 | Hex Screw, Connecting Rod | 250 |
29C | 07737 | Plunger Bolt | 26 |
48 | 06504/06089 | Plug, Valve | 160 |
49A | 07158 | Nut, Stud Bolt | 60 |
Contact Giant Industries or your local distributor for maintenance
of the gear end of your pump. Phone: 419/531-4600
Contact Giant Industries for service school information. Phone: (419)
10