Giant LP122A operating instructions To Reassemble Proceed As Follows

Models: LP122A

1 12
Download 12 pages 60.38 Kb
Page 9
Image 9
TO REASSEMBLE PROCEED AS FOLLOWS:

LP122A/LP122A-4000/LP123/LP255 - Repair Instructions

TO REASSEMBLE PROCEED AS FOLLOWS:

29E

29A

29B

29D

29C

7.If previously disassembled thoroughly clean all exposed surfaces on the spacer (29E) and all exposed threads on the plunger bolt (29C) and the steel plunger base (25). Threads MUST be free of old loc-tite and any other material such as oil, grease, etc. This is necessary to ensure proper curing of new loc-tite. Giant recommends cleaning the threads with acetone or other suitable cleaner. Reassemble plunger assembly parts (29A, 29B, & 29E) using a new copper gasket (29D) and the cleaned plunger bolt (29C). Slide the bolt through the center of the four (4) pieces so that the threaded end is exposed. Apply several drops of loc-tite 243 (or equivalent) adhesive to the threads. Thread into steel plunger base and tighten to 26 ft.-lbs.BECERTAINALLPARTSARECENTEREDWITHTHEBOLT!

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

36A

36

35

35A 35B (LP255 only)

39

 

 

 

 

 

 

 

 

 

 

 

8.Lubricate weep seal (36). Place, weep seal (36), and pressure ring (36A) into the seal sleeve (35). Assemble the o-ring (35A and 35B for LP255 only) onto seal sleeve and lubricate.

9.For LP255 pumps, insert sup- port ring (37) into valve casing (43). Place support ring (41) and v-sleeves (40) into valve casing.

6 4 2 7

8 1 3 5

10.Place entire manifold/seal sleeve assembly over the studs and push firmly until seated against the crankcase.

11.Tighten hex nuts (49A) in a crosswisepattern(shownabove) to 60 ft.-lbs.

9

Page 9
Image 9
Giant LP122A operating instructions To Reassemble Proceed As Follows