Set-Up
Overnight Shut Down Procedure
The following steps should be followed for overnight shutdown:
1.The yellow air valve located where the air enters the machine should be pushed to the “OFF” (closed) position. To do this simply push on the lever protruding out the side of the valve. This will also cause all the system air to bleed out of the system in a matter of a few seconds thus making the system incapable of operating.
Step 2 is a precautionary step and should be followed whenever the emergency stop valve is activated to the stop mode. Failure to do so will damage regulators and components when reactivating to the ON position.
2.Turn all system regulators to OFF (counter- clockwise) position.
Verify that the Catalyst Pressure Relief Line and the Resin Return Line are secured before relieving
catalyst and resin fluid pressure.
3.Catalyst pressure in the Slave Pump can be eliminated by rotating the yellow valve handle on the Slave Pump 90 degrees to the “ON” position.
The “ON” position the valve handle is parallel (in line) with the valve body .
The “OFF” position the valve handle is perpendicular (across) the valve body.
4.Resin pressure can be eliminated by rotating the yellow handled valve on the bottom of the fluid filter 90 degrees. Place a container under the bottom of the valve to catch any resin that is ejected from the valve.
8 |