Crathco Granita Preventive Maintenance (PM)
Checklist for Kit 90566 -
Serial # 11259 and above
(and units with lower serial #’s that have been converted to stainless steel shafts - units with black stainless shafts will need to be converted using PM Kit # 90110B)
Model # ___________________________
Serial # ____________________________
Date: ______________________________
PM by _____________________________
Of Company ________________________
Store Name/# _______________________
Address ___________________________
__________________________________
Store Mgr Name ____________________
Signature __________________________
A preventive maintenance visit should be performed every 6 months. In addition, air filter should be cleaned weekly, and every three months the condenser should be cleaned, and the rubber shaped bell shaft seals should be replaced. Failure to complete PM’s every 6 months is considered abuse of the machine, and therefore voids the warranty. Proof of PM must be documented with Grindmaster Corporation to maintain warranty coverage. To docu- ment your PM, complete this form with signatures, place used/worn parts that were replaced during the PM inside envelope, and mail to Grindmaster Corporation. Parts returned should include 2 evaporator seals, 2 rubber bell shaped shaft seals, valve
The following procedures should be performed during a Preventative Maintenance visit, using PM kit # 90566 or 90110B.
Document model and serial number of equipment and record above.
Check product temperature and consistency for proper setting - adjust if necessary.
Insure product is being mixed properly and is within specification (check and document brix - most products should be around 13% - refer to product manufacturer’s recommendations for exact recommended brix). Record Brix reading here: Left Bowl _____ Right Bowl _____
Check for leaks at gaskets,
Clean and sanitize top tray and freezing barrel.
Clean out condensation tube with sanitizer and long brush. Check condition of all panels, bowls, lids - replace if necessary.
Check mixing rods and augers for wear, check mixing rod bearing for wear - replace if necessary. Check for bowl knobs (two per bowl to lock down bowl in front) - replace if necessary.
Check operation of lights in lid and rear of unit (if equipped) - replace light bulbs if necessary. Clean
Clean condenser.
Check condition of bowl gaskets and replace if necessary. Replace all
Check drive shaft. Replace if necessary, using PM kit #90110B in place of 90566 above.
Replace evaporator seal in front of evaporator. (use brass tool, included, to slide seal onto shaft, and use the white tool to tap seal into place. Be sure to lubricate seal with food grade grease first)
Replace bell shaped rubber shaft seal on front of freezing barrel (generously lubricate inside seal)
Lubricate parts where appropriate (dispense valve
Verify and document defrost timer setting and operation and time of day setting and adjust if necessary. Check thermostat setting on MG models. Thermostat setting should be between
Verify compressor operation and freezer controller operation. Verify ventilation is adequate (8” on both sides and back) Check electrical connections and wiring.
Check fan operation (1 condenser fan and 2 gear motor fans) and clean fan or blades if necessary. Review proper periodic care and cleaning instructions (disassembly, cleaning, sanitizing, lubrication and
maintenance such as lubrication and filter cleaning).
Make sure store personnel have appropriate supplies (lubricant and sanitizer) to care for machine.
Page 14 | G & MG Series Granita Machine |
|
|