Grizzly G0711 instruction sheet Assembly & Setup, Items Needed for Assembly Qty

Models: G0711

1 8
Download 8 pages 16.63 Kb
Page 4
Image 4

Assembly & Setup

The Model G0711 requires a source of com- pressed air that can consistently deliver 4 CFM at 50-100 PSI.

Since the Model G0711 must be lubricated before each use, and at regular operating intervals, we recommend using a filter/lubricator/regulator with your compressed air line (see Figure 6) below.

Quick

Quick

Regulator

 

Connector

Connector

 

 

Lubricator

Your

 

Air Compressor

Tool

 

Air Hose

Filter

Quick

Quick

 

Coupler

Coupler

 

Figure 6. Air line setup with filter/lubricator/regu-

lator installed.

The Model G0711 can also be filled with fine sand to reduce vibration and noise during operation; however, this is optional.

Items Needed for Assembly

Qty

Hex Wrench 4mm

1

Hex Wrench 5mm

1

• Fine Sand 40 Lb. Bag (Optional)

1

To assemble and set up the Model G0711:

1.Insert the hammer assembly into the top of the C-frame assembly, position it as shown in Figure 7, and tighten the set screw.

Set Screw

Figure 7. Hammer installed in C-frame.

2.Pull the hammer assembly spring loop to the side and insert the hammer into the coil spring, making sure the ring on the ham- mer shaft is over the bottom spring loop, as shown in Figure 7.

 

 

Spring

Ring

 

Loop

Hammer

Figure 8. Hammer installed in spring.

3.Insert a die into the die housing, as shown in

Figure 9.

Die

Figure 9. Die inserted.

4.Raise the die housing up, and insert the pin as shown in Figure 10 to position the die near the hammer.

Pin

Figure 10. Pin inserted through bracket and

housing to position the die upward.

-4-

Model G0711 (Mfg. Since 7/10)

Page 4
Image 4
Grizzly instruction sheet Assembly & Setup, Items Needed for Assembly Qty, To assemble and set up the Model G0711